×

Method for determining an instantaneous unit hydrograph

  • US 6,522,972 B2
  • Filed: 07/18/2001
  • Issued: 02/18/2003
  • Est. Priority Date: 07/18/2001
  • Status: Active Grant
First Claim
Patent Images

1. A method for estimating surface water runoff to be received by a catchment from a watershed, said method comprising the steps of:

  • selecting a watershed having a catchment and channels;

    obtaining map data about said watershed;

    obtaining rainfall data for said watershed;

    identifying channels within said watershed from said map data;

    categorizing said channels in said watershed by order;

    making a first set of counts of the numbers of said channels of each order that drain into channels of each other order;

    making a second set of counts of the total numbers of channels of said each order;

    defining, from said map data, areas within said watershed that drain into said channels of said each order;

    measuring the total area of said watershed from said map data;

    measuring the total areas of said watershed that drain into said channels of said each order from said map data;

    determining overland waiting times from said map data for each area in said watershed;

    determining channel waiting times from said map data for each channel in said watershed;

    inputting said first and said second sets of counts, said total area of said watershed, said total areas of said watershed draining into said channels of said each order, said overland waiting times and said channel waiting times into a programmed general purpose computer;

    calculating, using said general purpose computer, an initial probability matrix from said total area of said watershed and said total areas of said watershed draining into said channels of said each order;

    calculating, using said general purpose computer, a transition probability matrix by dividing said first set of counts by said second sets of counts;

    multiplying, using said general purpose computer, said initial probability matrix by said transition probability matrix to obtain a state probability matrix;

    taking, using said general purpose computer, the time derivative of said state probability matrix at said catchment; and

    estimating said surface water runoff from said time derivative and said rainfall data for said watershed.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×