×

System and method for providing ballast loading for a turbo-generator

  • US 6,545,373 B1
  • Filed: 08/24/2001
  • Issued: 04/08/2003
  • Est. Priority Date: 08/24/2001
  • Status: Active Grant
First Claim
Patent Images

1. A method of providing controlled turbine loading in a turbo-generator based cooling system, comprising the steps of:

  • monitoring an output voltage of the turbo-generator;

    selectively coupling a ballast load to an electrical output of the turbo-generator to maintain the output voltage at a predetermined level.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×