×

Sand screen with active flow control and associated method of use

  • US 6,622,794 B2
  • Filed: 01/22/2002
  • Issued: 09/23/2003
  • Est. Priority Date: 01/26/2001
  • Status: Expired due to Term
First Claim
Patent Images

1. A method of regulating the flow of hydrocarbon fluid from a producing zone into a production well, said method comprising the steps of:

  • a. providing a fluid production tube in a wellbore having a formation fluid production zone, said production tube having a production flow bore therein;

    b. providing an intermediate fluid flow channel within said production tube between said production zone and said production flow bore;

    c. providing a static flow restriction within said intermediate channel;

    d. providing a first flow aperture between said intermediate channel and said production flow bore downstream of said flow restriction;

    e. providing a second flow aperture between said intermediate channel and said production flow bore upstream of said flow restriction; and

    , f. selectively obstructing fluid flow through either or both of said flow apertures.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×