Sand screen with active flow control and associated method of use
First Claim
1. A method of regulating the flow of hydrocarbon fluid from a producing zone into a production well, said method comprising the steps of:
- a. providing a fluid production tube in a wellbore having a formation fluid production zone, said production tube having a production flow bore therein;
b. providing an intermediate fluid flow channel within said production tube between said production zone and said production flow bore;
c. providing a static flow restriction within said intermediate channel;
d. providing a first flow aperture between said intermediate channel and said production flow bore downstream of said flow restriction;
e. providing a second flow aperture between said intermediate channel and said production flow bore upstream of said flow restriction; and
, f. selectively obstructing fluid flow through either or both of said flow apertures.
1 Assignment
0 Petitions
Accused Products
Abstract
Apparatus and methods are disclosed for actively controlling the flow of hydrocarbon fluids from a producing formation at the downhole sand screen. A preferred embodiment of the invention provides a fluid flow annulus within the production tube inside of the screen. In a first flow control configuration, fluid passing through the screen is required to flow along the annulus to find a flow aperture into an interior flow bore. A static flow control device within the annulus between the sand screen and a first flow aperture dissipates flow energy by forcing the flow through a restricted area that helically winds about the flow annulus. Dissipation of the flow energy increases the pressure reduction from the screen into the production bore and reduces the flow velocity. In a second flow control configuration, flow control structure within the flow annulus obstructs all flow along the annulus. A third flow control configuration removes all flow restrictions within the flow annulus.
308 Citations
17 Claims
-
1. A method of regulating the flow of hydrocarbon fluid from a producing zone into a production well, said method comprising the steps of:
-
a. providing a fluid production tube in a wellbore having a formation fluid production zone, said production tube having a production flow bore therein;
b. providing an intermediate fluid flow channel within said production tube between said production zone and said production flow bore;
c. providing a static flow restriction within said intermediate channel;
d. providing a first flow aperture between said intermediate channel and said production flow bore downstream of said flow restriction;
e. providing a second flow aperture between said intermediate channel and said production flow bore upstream of said flow restriction; and
,f. selectively obstructing fluid flow through either or both of said flow apertures. - View Dependent Claims (2, 3)
-
-
4. A well tool for regulating the flow rate of fluid from an earth producing zone, said tool comprising:
-
a. a well fluid production tube having a production flow channel therein and a production fluid flow screen for passing fluid from said producing zone into said production flow channel;
b. an intermediate flow channel between said flow screen and said production flow channel;
c. a static flow restriction in said intermediate channel;
d. a first fluid flow aperture between said intermediate flow channel and said production flow channel disposed downstream of said static flow restriction;
e. a second fluid flow aperture between said intermediate flow channel and said production flow channel disposed upstream of said static flow restriction; and
f. a selectively positioned flow obstruction for substantially preventing fluid flow through either or both of said flow apertures. - View Dependent Claims (5, 6, 7, 8, 9, 10, 11)
-
-
12. A method of regulating the flow of production fluid from a fluid producing zone into a production conduit comprising the steps of:
-
(a) providing first and second fluid flow routes for production fluid from a producing zone into a production conduit;
(b) providing greater resistance to flow along said second flow route relative to flow along said first flow route; and
,(c) providing a first selectively engaged flow obstruction along said first flow route. - View Dependent Claims (13, 14, 15, 16, 17)
-
Specification