Storage battery monitoring system with automatic electrical load shedding
First Claim
1. A method for controlling the electrical system of a marine vessel, comprising the steps of:
- measuring the voltage potential of a battery;
comparing said voltage potential to a threshold voltage magnitude;
disconnecting one or more of a plurality of electrical power consuming devices when said voltage potential is less than said threshold voltage magnitude; and
classifying each one of said plurality of said electrical power consuming devices according to its priority of criticality, wherein said priority of criticality is determinative of the order in which each of said plurality of said electrical power consuming devices is disconnected during said disconnecting step, said classifying step comprises the step of grouping said plurality of electrical power consuming devices into a level of said priority of criticality selected from the group consisting of critical and non-critical, said classifying step is performed in accordance with manually received instructions from said operator of said marine vessel.
7 Assignments
0 Petitions
Accused Products
Abstract
A method for controlling the electrical system of a marine vessel comprises the steps of measuring a battery potential, comparing the battery potential to a threshold voltage magnitude, and then disconnecting one or more of a plurality of electrical power consuming devices when the voltage potential is less than the threshold voltage magnitude. This is done to avoid the deleterious condition wherein an engine of the marine vessel is operating at idle speed and attempting to charge the battery while a plurality of electrical power consuming devices are operating and drawing sufficient current from the alternator to prevent the proper charging of the battery. In these circumstances, the battery potential can actually be depleted as the battery attempts to provide the additional required electrical current for the loads.
-
Citations
16 Claims
-
1. A method for controlling the electrical system of a marine vessel, comprising the steps of:
-
measuring the voltage potential of a battery;
comparing said voltage potential to a threshold voltage magnitude;
disconnecting one or more of a plurality of electrical power consuming devices when said voltage potential is less than said threshold voltage magnitude; and
classifying each one of said plurality of said electrical power consuming devices according to its priority of criticality, wherein said priority of criticality is determinative of the order in which each of said plurality of said electrical power consuming devices is disconnected during said disconnecting step, said classifying step comprises the step of grouping said plurality of electrical power consuming devices into a level of said priority of criticality selected from the group consisting of critical and non-critical, said classifying step is performed in accordance with manually received instructions from said operator of said marine vessel. - View Dependent Claims (3, 4, 5, 6, 7, 8)
communicating to an operator of said marine vessel information that said voltage potential being less than said threshold voltage magnitude; and
performing said disconnecting step unless said operator of said marine vessel manually overrides said disconnecting step.
-
-
4. The method of claim 3, further comprising:
waiting for at least one minute following said communication step for a response from said operator of said marine vessel before performing said disconnecting step.
-
5. The method of claim 1, further comprising:
measuring the voltage potential of said battery after said disconnecting step to determine the efficacy of said disconnecting step.
-
6. The method of claim 1, further comprising:
-
measuring a current consumption of at least one of said plurality of said electrical power consuming devices;
comparing said current consumption of at least one of said plurality of said electrical power consuming devices to a threshold current magnitude.
-
-
7. The method of claim 6, further comprising:
disconnecting said at least one of said plurality of said electrical power consuming devices when said current consumption of at least one of said plurality of said electrical power consuming devices is greater than said threshold current magnitude.
-
8. The method of claim 1, wherein:
said measuring and comparing steps are repeated at a frequency of at least once per second.
-
2. A method for controlling the electrical system of a marine vessel, comprising the steps of:
-
measuring the voltage potential of a battery;
comparing said voltage potential to a threshold voltage magnitude; and
disconnecting one or more of a plurality of electrical power consuming devices when said voltage potential is less than said threshold voltage magnitude;
measuring the operating speed of an engine of said marine vessel;
comparing said operating speed of said engine to a threshold speed magnitude; and
performing said disconnecting step only when said operating speed of said engine is less than said threshold speed magnitude.
-
-
9. A method for controlling the electrical system of a marine vessel, comprising the steps of:
-
measuring the voltage potential of a battery;
comparing said voltage potential to a threshold voltage magnitude;
communicating to an operator of said marine vessel information that said voltage potential being less than said threshold voltage magnitude;
disconnecting one or more of a plurality of electrical power consuming devices when said voltage potential is less than said threshold voltage magnitude unless said operator of said marine vessel manually overrides said disconnecting step;
measuring the operating speed of an engine of said marine vessel;
comparing said operating speed of said engine to a threshold speed magnitude; and
performing said disconnecting step only when said operating speed of said engine is less than said threshold speed magnitude. - View Dependent Claims (10, 11, 12, 13)
waiting for at least one minute following said communication step for a response from said operator of said marine vessel before performing said disconnecting step.
-
-
11. The method of claim 9, further comprising:
classifying each one of said plurality of said electrical power consuming devices according to its priority of criticality, wherein said priority of criticality is determinative of the order in which each of said plurality of electrical power consuming devices is disconnected during said disconnecting step, said classifying step comprising the step of grouping said plurality of electrical power consuming devices into a level of said priority of criticality selected from the group consisting of critical and non-critical.
-
12. The method of claim 11, wherein:
said classifying step is performed in accordance with manually received instructions from said operator of said marine vessel.
-
13. The method of claim 12, further comprising:
measuring the voltage potential of said battery after said disconnecting step to determine the efficacy of said disconnecting step.
-
14. A method for controlling the electrical system of a marine vessel, comprising the steps of:
-
measuring the voltage potential of a battery;
comparing said voltage potential to a threshold voltage magnitude;
measuring the operating speed of an engine of said marine vessel;
comparing said operating speed of said engine to a threshold speed magnitude;
communicating to an operator of said marine vessel information that said voltage potential being less than said threshold voltage magnitude; and
disconnecting one or more of a plurality of electrical power consuming devices when said voltage potential is less than said threshold voltage magnitude unless said operating speed of said engine is greater than said threshold speed magnitude or said operator of said marine vessel overrides said disconnecting step. - View Dependent Claims (15, 16)
waiting for at least one minute following said communication step for a response from said operator of said marine vessel before performing said disconnecting step.
-
-
16. The method of claim 15, further comprising:
-
classifying each one of,said plurality of said electrical power consuming devices according to its priority of criticality, wherein said priority of criticality is determinative of the order in which each of said plurality of said electrical power consuming devices is disconnected during said disconnecting step, said classifying step comprising the step of grouping said plurality of electrical power consuming devices into a level of said priority of criticality selected from the group consisting of critical and non-critical, said classifying step being performed in accordance with manually received instructions from said operator of said marine vessel; and
measuring the voltage potential of said battery after said disconnecting step to determine the efficacy of said disconnecting step.
-
Specification