×

Problem isolation through translating and filtering events into a standard object format in a network based supply chain

  • US 6,671,818 B1
  • Filed: 11/22/1999
  • Issued: 12/30/2003
  • Est. Priority Date: 11/22/1999
  • Status: Expired due to Term
First Claim
Patent Images

1. A method for life cycle network asset management in a network based supply chain, comprising the steps of:

  • a) monitoring a supply chain network;

    b) receiving events from network assets, wherein the network assets include both packet-switched and circuit-switched network assets, and wherein the events are received by custom software interfaces which communicate directly with the network assets;

    c) filtering and correlating the events, whereby problems with network assets are further isolated; and

    d) translating the filtered and isolated events into a standard object format for facilitating the determination of the life cycle of problem network assets, and wherein the events are translated by a comprehensive library of all possible message types provided by the custom software interfaces.

View all claims
  • 4 Assignments
Timeline View
Assignment View
    ×
    ×