×

Internet based supplier process reliability system

  • US 6,675,129 B1
  • Filed: 12/28/2000
  • Issued: 01/06/2004
  • Est. Priority Date: 12/28/2000
  • Status: Active Grant
First Claim
Patent Images

1. A goods reliability evaluation process comprising the following steps:

  • at least one host generating information establishing a manufacturer reference site number and at least one supplier reference number for at least one good to be received by said host;

    at least one supplier, after conducting reliability tests on at least one good in an least one test period, logs on to a supplier process quality (SPQ) web site and inputs test and failure data;

    reliability calculations are then completed to determine the quality of at least one good, wherein said test results automatically generate at least one alarm when predetermined test parameters have been breached.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×