×

Post-harvest non-containerized reporting system

  • US 6,687,616 B1
  • Filed: 09/09/2002
  • Issued: 02/03/2004
  • Est. Priority Date: 09/09/2002
  • Status: Active Grant
First Claim
Patent Images

1. A post-harvest GPS-based reporting system comprising:

  • a) a field of crop for which GPS location-based boundaries are pre-mapped and recorded;

    b) means for harvesting said field of crop including a first GPS receiving device, a first data logging device, a first holding tank to store a load of crop that has been harvested from an identifiable portion of said field of crop, and means for transferring said load out of said holding tank wherein said first receiving device and said first data logging device records a discreet GPS data string associated with actuation of said means for transferring said crop load;

    c) a grain cart comprising a second holding tank for receiving at least one said crop load from said means for harvesting, and a second GPS receiving device and a second data logging device;

    d) a transportation vehicle comprising a third holding tank for receiving at least one said crop load from said grain cart, and a third GPS receiving device and a third data logging device;

    e) said grain cart further comprising means for transferring said at least one crop load to said third holding tank in said transportation vehicle wherein said second GPS receiving device and said second data logging device records a discreet GPS data string associated with actuation of said means for transferring said at least one crop load;

    f) a final storage location for receiving said third holding tank of said at least one crop load and at which recordable data is established concerning the time of delivery of said crop load to said location;

    g) means for uploading data received by said first, second and third GPS receiving devices and recorded by said first, second and third data logging devices; and

    h) means for storing, linking and associating said uploaded data and said GPS location boundaries for said field based upon the time of delivery of said crop load to said final storage location, and to create and generate reports of same.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×