×

Base-pipe flow control mechanism

  • US 6,745,843 B2
  • Filed: 01/22/2002
  • Issued: 06/08/2004
  • Est. Priority Date: 01/23/2001
  • Status: Expired due to Fees
First Claim
Patent Images

1. A completion assembly deployed within a well bore, comprising:

  • a base pipe having a sidewall with at least one hole through the sidewall;

    a filter surrounding at least a portion of the base pipe;

    a plurality of splines located between the base pipe and the filter; and

    a rod selectively insertable between adjacent splines, selectively covering the at least one hole.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×