×

Method for filling a mold

  • US 6,779,588 B1
  • Filed: 10/29/2001
  • Issued: 08/24/2004
  • Est. Priority Date: 10/29/2001
  • Status: Expired due to Term
First Claim
Patent Images

1. A method for filling a mold by a desired fill profile having at least four filling stages, stage 1, stage 2, stage 3 and stage 4, associated with four time intervals, t0 to t1, t1 to t2, t2 to t3, and t3 to t4, respectfully, and with four pressure change intervals, P0 to P1, P1 to P2, P2 to P3 and P3 to P4, respectively, to make a cast article comprising the steps of:

  • (a) providing a molten metal to a casting chamber in fluid communication with the mold, the casting chamber having a supply conduit for introducing a gas into the casting chamber, and the casting chamber having an evacuation conduit for delivering the molten metal from the casting chamber to the mold;

    (b) controlling the filling of the mold during the first time interval t0 to t1 of stage 1 by delivering the molten metal from the casting chamber to the mold at a first rate by supplying the gas to the casting chamber during stage 1 at to at P0 and at t1 at P1 to allow the molten metal to rise at the first rate, stage 1 including an acceleration portion wherein the molten metal is accelerated up to a desired fill rate for stage 1, the first rate operative to produce a first stage actual fill profile;

    (c) controlling the filling of the mold during the second time interval t1 to t2 of stage 2 by delivering the molten metal from the casting chamber to the mold at a second rate by supplying the gas to the casting chamber during stage 2 at t1 at P1 and at t2 at P2 to allow the molten metal to rise at the second rate, the second rate operative to produce a second stage actual fill profile, the second rate being less than the first rate to thereby prevent the actual fill profile during the transition from the end of the first stare actual fill profile to the beginning of the second stage actual fill profile from overshooting the desired fill profile and causing the molten metal to bounce and create turbulence in the mold whereby the mold fills more slowly with molten metal during stage 2 than during stage 1 to thereby produce a smooth transition in the filling of the mold cavity indicated graphically by a gradually decreasing slope value during the transition from the end of stage 1 to the beginning of stage 2;

    (d) controlling the filling of the mold during the third time interval t2 to t3 of stage 3 by delivering the molten metal from the casting chamber to the mold at a third rate by supplying the gas to the casting chamber during stage 3 at t2 at P2 and at t3 at P3 to allow the molten metal to rise at the third rate, the third rate being greater than the second rate whereby the mold fills more quickly with molten metal during stage 3 than during stage 2, the third rate operative to produce a third stage actual fill profile; and

    (e) controlling the filling of the mold during the fourth time interval t3 to t4 of stage 4 by delivering the molten metal from the casting chamber to the mold at a fourth rate by supplying the gas to the casting chamber during stage 4 at t3 at P3 and at t4 at P4 to allow the molten metal to rise at the fourth rate, the fourth rate operative to produce a fourth stage actual fill profile, the fourth rate being less than the third rate to thereby prevent the actual fill profile during the transition from the end of the third stage actual fill profile to the beginning of the fourth stage actual fill profile from overshooting the desired fill profile and causing the molten metal to bounce and create turbulence in the mold whereby the mold fills more slowly with molten metal during stage 4 than during stage 3 to thereby produce a smooth transition in the filling of the mold cavity indicated graphically by a gradually decreasing slope value during the transition from the end of stage 3 to the beginning of stage 4.

View all claims
  • 36 Assignments
Timeline View
Assignment View
    ×
    ×