×

Method and system for software rejuvenation via flexible resource exhaustion prediction

  • US 6,810,495 B2
  • Filed: 03/30/2001
  • Issued: 10/26/2004
  • Est. Priority Date: 03/30/2001
  • Status: Expired due to Fees
First Claim
Patent Images

1. In a computer system where at least one software component thereof is restarted based on projection of resource exhaustion, a method for selecting the most suitable projection method from among a class of projection methods, comprising:

  • providing M fitting modules which take measured symptom data associated with said system as input and produce M scores, wherein M is an integer;

    selecting the fitting module producing the best score; and

    from the selected module, producing a prediction of the resource exhaustion time.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×