Computerized laboratory information management system
DC CAFCFirst Claim
Patent Images
1. A computer-implemented method to perform quality control on a pavement construction material mixture, comprising:
- accessing a server located on a wide-area-network;
sending information collected from the pavement construction material mixture to the server;
applying one or more test methodologies to the collected information;
generating one or more reports from the test methodologies; and
sending the one or more reports to a project manager.
2 Assignments
Litigations
0 Petitions
Accused Products
Abstract
A computer-implemented system performs quality control on a construction material mixture includes accessing a server located on a wide-area-network; sending information collected from the material mixture to the server; applying one or more test methodologies to the collected information; generating one or more reports from the test methodologies; and sending the one or more reports to a project manager.
56 Citations
20 Claims
-
1. A computer-implemented method to perform quality control on a pavement construction material mixture, comprising:
-
accessing a server located on a wide-area-network;
sending information collected from the pavement construction material mixture to the server;
applying one or more test methodologies to the collected information;
generating one or more reports from the test methodologies; and
sending the one or more reports to a project manager. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12)
-
-
13. A system for performing quality control on a pavement construction material mixture, comprising:
-
a wide-area-network;
one or more client computers coupled to the wide-area-network, each client computer adapted to collect information relating to the pavement construction material mixture properties; and
a server coupled to the wide-area network, the server applying one or more test methodologies to the collected information;
generating one or more reports from the test methodologies; and
sending the one or more reports to a project manager.- View Dependent Claims (14, 15, 16, 17, 18, 19, 20)
-
Specification