×

Method for managing construction machine, and arithmetic processing apparatus

  • US 6,832,175 B2
  • Filed: 09/27/2002
  • Issued: 12/14/2004
  • Est. Priority Date: 03/31/2000
  • Status: Expired due to Term
First Claim
Patent Images

1. A method for managing a construction machine, the method comprising:

  • a first step of measuring a working time for each of sections in each of a plurality of construction machines, transferring the measured working time for each section to a base station computer, and storing and accumulating the transferred working time as operation data in a database;

    a second step of, in base station computer, reading the operation data regarding a particular construction machine from said database and calculating a scheduled repair/replacement timing of a part belonging to each section on the basis of the working time of said section. a third step of executing processing to allow a maker and a user of said particular construction machine to learn said scheduled repair/replacement timing calculated in said second step, respectively.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×