×

System and method for replenishment by purchase with attribute based planning

  • US 6,885,902 B2
  • Filed: 11/05/2002
  • Issued: 04/26/2005
  • Est. Priority Date: 12/27/2001
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for planning the replenishment of a supply chain network resource by purchase in order to fulfill demand as defined by an order, wherein said order defining a stock keeping unit with attribute, comprising the steps:

  • determining time items, wherein said time items are specific points in time or time periods relating to said order and wherein at least one of said items is a purchase lead time based on said stock keeping unit with attribute, and wherein said time items further comprising a purchase order placement date, a replenish start date, a replenish need date, a maximum lateness, and a maximum earliness, wherein said purchase lead time is defined as amount of time needed to make available requested replenish material;

    determining timing events based on said time items;

    creating a timeline comprising of said timing events and time items;

    selecting an applicable scenario based on said timeline from a group of predetermined scenarios; and

    generating an output based on said applicable scenario.

View all claims
  • 10 Assignments
Timeline View
Assignment View
    ×
    ×