×

Method and apparatus for optimized centralized critical control architecture for switchgear and power equipment

  • US 6,892,115 B2
  • Filed: 02/25/2003
  • Issued: 05/10/2005
  • Est. Priority Date: 02/25/2002
  • Status: Expired due to Term
First Claim
Patent Images

1. A method of monitoring and controlling a power distribution system, said method comprising:

  • transmitting at least one first message from a plurality of node electronic units to a processor over a network, said first message being indicative of a power condition in the power distribution system and/or a condition of a circuit breaker in communication with each of said plurality of node electronic units;

    determining an operational state of the power distribution system from said first message; and

    transmitting at least one second message from said processor to each of said plurality of node electronics unit such that said circuit breakers are operable by said processor.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×