Method and system for managing construction machine, and arithmetic processing apparatus
First Claim
1. A method for managing a construction machine, the method comprising:
- a first step of measuring a working time for each section in each of a plurality of construction machines, and storing and accumulating the measured working time as operation data for each construction machine in a database;
a second step of determining, based on repair/replacement data for each part of the construction machine and said operation data, an actual repair/replacement time interval of each part on the basis of the working time per section to which the relevant part belongs; and
a third step of statistically processing the actual repair/replacement time interval and setting a target repair/replacement time interval of the relevant part to be used for deciding a scheduled repair/replacement timing of a corresponding part of the particular construction machine using the statistically processed data and wherein;
said third step further includes steps of determining a relationship between the actual repair/replacement time interval of a part determined in said second step and the number of times of actual repair/replacement of said part, determining a repair/replacement time interval corresponding to a maximum number of times of repair/replacement from said relationship, and deciding the target repair/replacement time interval of said part based on the determined repair/replacement time interval.
1 Assignment
0 Petitions
Accused Products
Abstract
A method and system for managing a construction machine whereby working time for each of different parts of a hydraulic excavator is measured. Measured data is stored in a memory of a controller and then transferred to a base station computer via satellite communication to be stored in a database. At each repair/replacement of a part in each hydraulic excavator, the base station computer calculates, based on the operation data, a replacement time interval of the part on the basis of the working time per section to which the part belongs, and then stores and accumulates it. The base station computer also reads the stored data for each hydraulic excavator, determines, for each part, a replacement rate of the part having a substantially equal replacement time interval, and calculates a target replacement time interval of the part in accordance with the replacement time interval corresponding to a maximum replacement rate.
-
Citations
19 Claims
-
1. A method for managing a construction machine, the method comprising:
-
a first step of measuring a working time for each section in each of a plurality of construction machines, and storing and accumulating the measured working time as operation data for each construction machine in a database;
a second step of determining, based on repair/replacement data for each part of the construction machine and said operation data, an actual repair/replacement time interval of each part on the basis of the working time per section to which the relevant part belongs; and
a third step of statistically processing the actual repair/replacement time interval and setting a target repair/replacement time interval of the relevant part to be used for deciding a scheduled repair/replacement timing of a corresponding part of the particular construction machine using the statistically processed data and wherein;
said third step further includes steps of determining a relationship between the actual repair/replacement time interval of a part determined in said second step and the number of times of actual repair/replacement of said part, determining a repair/replacement time interval corresponding to a maximum number of times of repair/replacement from said relationship, and deciding the target repair/replacement time interval of said part based on the determined repair/replacement time interval. - View Dependent Claims (2)
-
-
3. A method for managing a construction machine, the method comprising:
-
a first step of measuring a working time for each section in each of a plurality of construction machines, and storing and accumulating the measured working time as operation data for each construction machine in a database;
a second step of determining, based on repair/replacement data for each part of the construction machine and said operation data, an actual repair/replacement time interval of each part on the basis of the working time per section to which the relevant part belongs; and
a third step of statistically processing the actual repair/replacement time interval and setting a target repair/replacement time interval of the relevant part to be used for deciding a scheduled repair/replacement timing of a corresponding part of the particular construction machine using the statistically processed data and wherein; said first step further includes steps of measuring and collecting a load for each section in addition to the working time for each section, and storing and accumulating the measured working time and load for each section as the operation data for each construction machine in said database; and
said method further includes a fourth step of statistically processing the actual repair/replacement time interval of the part and the load both determined in said second step, and a fifth step of determining said target repair/replacement time interval, as a value modified depending on loads, based on the operation data of the particular construction machine and the statistically processed data. - View Dependent Claims (4, 5, 6, 7, 8)
-
-
9. A method for managing a construction machine, the method comprising:
-
a first step of measuring a working time for each section in each of a plurality of construction machines, and storing and accumulating the measured working time as operation data for each construction machine in a database;
a second step of determining, based on repair/replacement data for each part of the construction machine and said operation data, an actual repair/replacement time interval of each part on the basis of the working time per section to which the relevant part belongs; and
a third step of statistically processing the actual repair/replacement time interval and setting a target repair/replacement time interval of the relevant part to be used for deciding a scheduled repair/replacement timing of a corresponding part of the particular construction machine using the statistically processed data and wherein; said first step further includes steps of measuring and collecting a load for each section in addition to the working time for each section, and storing and accumulating the measured working time and load for each section as the operation data for each construction machine in said database; and
the method further comprises a fourth step of determining, based on the operation data accumulated in said first step, a working time of a corresponding part on the basis of the working time per section of a particular construction machine, determining a load factor during the determined working time, modifying the determined working time in accordance with the load factor, and comparing the modified working time with a preset target repair/replacement time interval, thereby calculating a remaining time up to a next repair/replacement of the relevant part.
-
-
10. A system for managing a construction machine, the system comprising:
-
operation data measuring and collecting means for measuring and collecting a working time for each section in each of a plurality of construction machines; and
a base station computer installed in a base station and having a database for storing and accumulating, as operation data, the working time measured and collected for each section, said base station computer comprising first means for determining, based on repair/replacement data for each part of the construction machine and said operation data, an actual repair/replacement time interval of each part on the basis of the working time per section to which the relevant part belongs; and
second means for statistically processing the actual repair/replacement time interval and setting a target repair/replacement time interval of the relevant part to be used for deciding a scheduled repair/replacement timing of a corresponding part of the particular construction machine using the statistically processed data and wherein;
said second means further includes means for determining a relationship between the actual repair/replacement time interval of a part determined by said first means and the number of times of repairs/replacements of said part, means for determining a repair/replacement time interval corresponding to a maximum number of times of repairs/replacements from said relationship, and means for deciding the target repair/replacement time interval of said part based on the determined repair/replacement time interval. - View Dependent Claims (11)
-
-
12. A system for managing a construction machine, the system comprising:
-
operation data measuring and collecting means for measuring and collecting a working time for each section in each of a plurality of construction machines; and
a base station computer installed in a base station and having a database for storing and accumulating, as operation data, the working time measured and collected for each section, said base station computer comprising first means for determining, based on repair/replacement data for each part of the construction machine and said operation data, an actual repair/replacement time interval of each part on the basis of the working time per section to which the relevant part belongs; and
second means for statistically processing the actual repair/replacement time interval and setting a target repair/replacement time interval of the relevant part to be used for deciding a scheduled repair/replacement timing of a corresponding part of the particular construction machine using the statistically processed data and wherein;
said operation data measuring and collecting means further includes means for measuring and collecting a load for each section in addition to the working time for each section;
said base station computer includes means for storing and accumulating the measured working time and load for each section as the operation data in said database; and
said system further includes third means for statistically processing the actual repair/replacement time interval of the part and the load both determined by said first means, and fourth means for determining said target repair/replacement time interval, as a value modified depending on loads, based on the operation data of the particular construction machine and the statistically processed data. - View Dependent Claims (13, 14, 15, 16, 17)
-
-
18. A system for managing a construction machine, the system comprising:
-
operation data measuring and collecting means for measuring and collecting a working time for each section in each of a plurality of construction machines; and
a base station computer installed in a base station and having a database for storing and accumulating, as operation data, the working time measured and collected for each section, said base station computer comprising first means for determining, based on repair/replacement data for each part of the construction machine and said operation data, an actual repair/replacement time interval of each part on the basis of the working time per section to which the relevant part belongs; and
second means for statistically processing the actual repair/replacement time interval and setting a target repair/replacement time interval of the relevant part to be used for deciding a scheduled repair/replacement timing of a corresponding part of the particular construction machine using the statistically processed data and wherein;
said operation data measuring and collecting means includes means for collecting and measuring a load for each section in addition to the working time for each section;
said base station computer includes means for storing and accumulating the measured working time and load for each section as the operation data in said database; and
said base station computer further comprises third means for determining, based on said accumulated operation data, a working time of a corresponding part on the basis of the working time per section of a particular construction machine, for determining a load factor during the determined working time, for modifying the determined working time in accordance with the load factor, and for comparing the modified working time with a preset target repair/replacement time interval, thereby calculating a remaining time up to next repair/replacement of the relevant part.
-
-
19. A processing apparatus, comprising means for storing and accumulating, as operation data, a working time for each section in each of a plurality of construction machines means for determining, based on repair/replacement data for each part of the construction machine and said operation data, an actual repair/replacement time interval of each part on the basis of the working time per section to which the relevant part belongs, means for statistically processing the actual repair/replacement time interval, and means for setting a target repair/replacement time interval of the relevant part to be used for deciding a scheduled repair/replacement timing of a corresponding part of the particular construction machine using the statistically processed data and which further includes means for storing and accumulating, as the operation data, a load for each section in addition to the working time for each section, means for statistically processing the actual repair/replacement time interval of the part and the load, and means for determining said target repair/replacement time interval, as a value modified depending on loads, based on the operation data of the particular construction machine and the statistically processed data.