Method and system for managing construction machine, and arithmetic processing apparatus

  • US 6,907,384 B2
  • Filed: 03/30/2001
  • Issued: 06/14/2005
  • Est. Priority Date: 03/31/2000
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for managing a construction machine, the method comprising:

  • a first step of measuring a working time for each section in each of a plurality of construction machines, and storing and accumulating the measured working time as operation data for each construction machine in a database;

    a second step of determining, based on repair/replacement data for each part of the construction machine and said operation data, an actual repair/replacement time interval of each part on the basis of the working time per section to which the relevant part belongs; and

    a third step of statistically processing the actual repair/replacement time interval and setting a target repair/replacement time interval of the relevant part to be used for deciding a scheduled repair/replacement timing of a corresponding part of the particular construction machine using the statistically processed data and wherein;

    said third step further includes steps of determining a relationship between the actual repair/replacement time interval of a part determined in said second step and the number of times of actual repair/replacement of said part, determining a repair/replacement time interval corresponding to a maximum number of times of repair/replacement from said relationship, and deciding the target repair/replacement time interval of said part based on the determined repair/replacement time interval.