×

Generator monitoring, control and efficiency

  • US 6,912,889 B2
  • Filed: 02/18/2002
  • Issued: 07/05/2005
  • Est. Priority Date: 02/19/2001
  • Status: Expired due to Fees
First Claim
Patent Images

1. An electricity generation system comprising:

  • a first generator;

    a first controller coupled directly to the first generator;

    a second generator;

    a second controller coupled directly to the second generator;

    a remote control and monitoring node coupled to the first and second controllers to monitor and control the first and second generators; and

    wherein the first generator is a fossil-fuel based generator, and the first controller comprises a continuous emissions monitoring system to monitor qualitative emissions relative to the first generator.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×