×

Heuristics for efficient supply chain planning in a heterogeneous production line

  • US 6,920,366 B1
  • Filed: 03/04/2004
  • Issued: 07/19/2005
  • Est. Priority Date: 03/04/2004
  • Status: Expired due to Fees
First Claim
Patent Images

1. A capacity planning system that allocates usage of a plurality of manufacturing elements of a manufacturing enterprise comprising:

  • a capacity planning processor in communications with at least one order management system of said manufacturing enterprise to receive at least one fabrication forecast describing scheduling and types of product lots that are predicted to be fabricated within a first period of time by said manufacturing enterprise and in communication with at least one computer integrated manufacturing system to receive rolling statistics of products lots fabricated during a second period of time, wherein said capacity planning processor performs the steps of;

    determining a priority ranking of said product lots predicted to be fabricated from heuristics developed from said product lots fabricated during said second period of time, allocating of said predicted product lots to said manufacturing elements, and balancing said predicted product lots between said manufacturing elements according to manufacturing element balancing guidelines.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×