×

Wind power management system and method

  • US 6,925,385 B2
  • Filed: 05/16/2003
  • Issued: 08/02/2005
  • Est. Priority Date: 05/16/2003
  • Status: Expired due to Fees
First Claim
Patent Images

1. A wind power management system for monitoring, a group of wind turbine generator parks, comprising:

  • a plurality of SCADA systems each including a SCADA server for collecting wind turbine generator data in real time for each park and for calculating individual process data reports based thereon;

    a real-time wind power portfolio manager for monitoring, controlling, maintaining, analyzing and benchmarking performances of wind turbines generators situated in wind parks in real time and on demand for the life of the projects;

    said manager having a reporting module for generating profile reports for the performance of the wind turbine generators;

    a portfolio manager server for providing said profile reports on-line regarding the wind turbine generators; and

    said profile manager server for receiving and storing the real-time data and the individual process data reports from each SCADA server to enable said profile reports to be based on the history of the project for each one of the parks.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×