×

Methods and apparatus for testing a train control system

  • US 6,997,418 B1
  • Filed: 07/26/2000
  • Issued: 02/14/2006
  • Est. Priority Date: 11/05/1997
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for testing a distributed electrical power control system for controlling locomotive power to move a train having a first locomotive and at least one second locomotive, the power control system including a train control system comprising a first control unit on the first locomotive configured to control power generated on the first locomotive, a second control unit on a second locomotive to control power generated on a second locomotive respective, the first and second control units establishing a communication link to communicate power control messages between the first and second control units, the first control unit further being configured to communicate with a distributed electrical power control system testing device independent of its communication with a second control unit to enable testing of the first unit without use of a second control unit, said method for testing comprising:

  • providing a testing device that emulates the operation of a second control unit but that is not carried on a second locomotive to control power generated onboard the second locomotive;

    establishing a communication link between the testing device and the first locomotive control unit that emulates the communication link that would exist between the first control unit and a second control unit;

    executing preprogrammed test scripts to test the distributed power control system without communicating between the first control unit and a second control unit and without controlling the generation of power on a second locomotive; and

    using the testing device to emulate the operations and communications of a second control unit relative to the first control unit.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×