Real time asset optimization
First Claim
1. A method for optimizing the maintenance of assets and production comprising:
- a) acquiring at least one maintenance trigger indicative that a maintenance action is or may be required for at least one of said assets;
b) in response to said acquired at least one maintenance trigger defining in real time a maintenance schedule for said maintenance action; and
c) transmitting in response to said defined maintenance schedule a request to a system that schedules production for a period of time in a production schedule to perform said maintenance action.
2 Assignments
0 Petitions
Accused Products
Abstract
A technique to optimize both the production schedule and the maintenance of plant assets based on predetermined criteria which may be economic or otherwise. In one embodiment the technique receives at least one maintenance trigger (MT) and one production order and evaluates those inputs to propose one or more solutions for the joint scheduling of the asset maintenance and required plant production. In another embodiment a computerized maintenance management system (CMMS) acquires a new MT and proposes a new maintenance schedule. The technique transmits a blocking order to a production scheduling (PS) system for converting the maintenance request into a production schedule. In another embodiment, a CMMS acquires a new MT and asks for confirmation of a time slot to perform the maintenance action. The technique evaluates the priorities and finds based on the predetermined criteria the right time slot and communicates a request for that slot to the PS.
45 Citations
16 Claims
-
1. A method for optimizing the maintenance of assets and production comprising:
-
a) acquiring at least one maintenance trigger indicative that a maintenance action is or may be required for at least one of said assets; b) in response to said acquired at least one maintenance trigger defining in real time a maintenance schedule for said maintenance action; and c) transmitting in response to said defined maintenance schedule a request to a system that schedules production for a period of time in a production schedule to perform said maintenance action. - View Dependent Claims (2, 3, 4, 5)
-
-
6. A method for optimizing the maintenance of assets and production comprising:
-
a) acquiring at least one maintenance trigger indicative that a maintenance action is or may be required for at least one of said assets; b) in response to said acquired at least one maintenance trigger requesting in real time a period of time in a production schedule to perform said maintenance action; and c) determining by use of a predetermined criteria related to said production and in response to said request for said period of time in said production schedule to perform said maintenance action a time for performance of said maintenance action. - View Dependent Claims (7, 8, 9, 10, 11, 12)
-
-
13. A system for optimizing the maintenance of assets and production comprising:
-
a) a maintenance scheduling system responsive to at least one maintenance trigger indicative that a maintenance action is or may be required for at least one of said assets to define in real time a maintenance schedule for said maintenance action; b) a system for scheduling production of at least a certain quantity of a certain product; and c) means responsive to said defined maintenance schedule received from maintenance scheduling system for transmitting to said production scheduling system a request for a period of time in a production schedule to perform said maintenance action. - View Dependent Claims (14)
-
-
15. A system for optimizing the maintenance of assets and production comprising:
-
a) a system for scheduling production of at least a certain quantity of a certain product; b) a maintenance scheduling system responsive to at least one maintenance trigger indicative that a maintenance action is or may be required for at least one of said assets to generate in real time a request for a period of time in said production scheduling system to perform said maintenance action; and c) means responsive to said request for said period of time to perform said maintenance action in said production scheduling system for determining by use of a predetermined criteria related to said production and said time to perform said maintenance action a time for performance of said maintenance action and transmitting said time for performance of said maintenance action to said production scheduling system. - View Dependent Claims (16)
-
Specification