Load acquisition for machine clamp registries
First Claim
1. A method for monitoring clamping loads used to clamp the clamp portions of a production part in position in a machining fixture, comprising the steps of:
- substituting a test part for the production part wherein said test part is configured with sufficient size and shape so that the test part interfaces in a like manner as a production part in position in the machining fixture and includes at least one clamp portion in the same location as a clamp portion on said production part and wherein a load cell is installed at said at least one damn portion;
clamping said test part with a clamp at said at least one clamp portion of said test part; and
collecting and recording data from said load cell.
14 Assignments
0 Petitions
Accused Products
Abstract
A method and apparatus for monitoring clamp loads used to clamp production pallets in position in a transfer machining line is disclosed. The steps include substituting a test pallet for a production pallet during a production cycle. The test pallet includes at least one load cell located at a respective clamp portion. The next step is to detect when the test pallet is at the machining station and ready to be clamped. The test pallet is then clamped at its clamp portion having the load cell. Clamp load data is collected and stored in a data collector located on-board the test pallet. This data may be downloaded at the end of the cycle in a readable format.
-
Citations
15 Claims
-
1. A method for monitoring clamping loads used to clamp the clamp portions of a production part in position in a machining fixture, comprising the steps of:
-
substituting a test part for the production part wherein said test part is configured with sufficient size and shape so that the test part interfaces in a like manner as a production part in position in the machining fixture and includes at least one clamp portion in the same location as a clamp portion on said production part and wherein a load cell is installed at said at least one damn portion; clamping said test part with a clamp at said at least one clamp portion of said test part; and collecting and recording data from said load cell.
-
-
2. A test pallet to substitute for a production pallet having a clamp portion located thereon in a station for machining comprising:
-
said test pallet configured with a clamp portion like said production pallet and with sufficient size and shape so that the test pallet interfaces in a like manner with a clamp registry of the station for machining but distinguished from said production pallet by being capable of recording data; said clamp portion on said test pallet being in the same location as the clamp portion on said production pallet; a load cell installed at said clamp portion on said test pallet; and an on-board data acquisition collector. - View Dependent Claims (3, 4, 5, 6)
-
-
7. A method for monitoring clamp loads used to clamp a production pallet in position for at least one matching station, comprising the steps of:
-
substituting a production pallet with a test pallet; detecting when said test pallet is at the machining station and ready to record load cell data; clamping said test pallet at at least one clamp portion having a load cell installed thereto; and collecting and storing load data from said load cells. - View Dependent Claims (8, 9, 10)
-
-
11. A method for monitoring clamp loads used to clamp production pallets in position in a transfer machining line, comprising the steps of:
-
substituting a test pallet for a production pallet during a production cycle wherein said test pallet includes at least one load cell located at a respective clamp portion; placing said test pallet on a transfer bar which lifts and carries said test pallet from station to station; separating said transfer bar from said test pallet when said test pallet is delivered to a first machining station; clamping said test pallet with a clamp at said clamp portion; detecting when said transfer bar has separated from said test pallet; collecting and storing data from said load cell. - View Dependent Claims (12, 13, 14, 15)
-
Specification