×

Method, system and facility for controlling resource allocation within a manufacturing environment

  • US 7,054,704 B2
  • Filed: 07/08/2005
  • Issued: 05/30/2006
  • Est. Priority Date: 03/05/2001
  • Status: Expired due to Term
First Claim
Patent Images

1. A method of managing resources in a build-to-order manufacturing facility, the method comprising:

  • automatically maintaining a work-in-process (WIP) profile for an area in a manufacturing facility, based on scans of each product unit entering the area and each product unit leaving the area;

    maintaining order management information for product in the area;

    automatically updating a display device in a control center for the manufacturing facility to depict the total amount of product in the area in substantially real time, based on the WIP profile;

    after updating the display device in the control center to depict the total amount of product in the area, receiving user input that specifies a desired dynamic reallocation of resources for the manufacturing facility based upon the WIP profile and the order management information; and

    in response to receiving the user input that specifies a desired dynamic reallocation of resources, automatically communicating with the area in the manufacturing facility to implement the desired reallocation of resources.

View all claims
  • 14 Assignments
Timeline View
Assignment View
    ×
    ×