×

Method for validating operation of a fibre link

  • US 7,055,068 B2
  • Filed: 07/25/2002
  • Issued: 05/30/2006
  • Est. Priority Date: 07/25/2002
  • Status: Active Grant
First Claim
Patent Images

1. A method for validating operation of a fibre link within a fibre channel loop, comprising:

  • receiving a Loop Initialization Primitive (LIP) to initialize the fibre link;

    entering a trial link up state upon receiving the Loop Initialization Primitive (LIP) so that normal commands to other devices within the fibre channel loop are not resumed; and

    thereafter entering a final link up state and resuming normal commands to other devices within the fibre channel loop,wherein a Loop Initialization Primitive (LIP) command is not sent by any device within the fibre channel loop during the trial link up state.

View all claims
  • 9 Assignments
Timeline View
Assignment View
    ×
    ×