×

Optimizing plant control values of a power plant

  • US 7,058,552 B2
  • Filed: 12/19/2001
  • Issued: 06/06/2006
  • Est. Priority Date: 12/21/2000
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for optimizing power plant control values, where the method comprises the steps ofa) determining a trajectory of plant control values,b) determining from the trajectory of plant control values, by simulation of the power plant'"'"'s behavior, corresponding trajectories of costs for operating the plant and trajectories of revenues from selling produced output,c) computing a total operating cost as an integral of an objective function that comprises a difference between costs and revenues,d) iteratively repeating steps a) through c) with the optimization module varying the trajectory of plant control values until an optimized lower total operating cost is arrived at,wherein in step b), by modeling of plant components, a trajectory representing a rate of ageing of plant components is determined from the trajectory of plant control values, and that, in step c), the objective function comprises said rate of ageing.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×