×

Robust multi-criteria MBT timing estimation using ionization signal

  • US 7,086,382 B2
  • Filed: 06/11/2003
  • Issued: 08/08/2006
  • Est. Priority Date: 11/01/2002
  • Status: Expired due to Term
First Claim
Patent Images

1. A method of estimating minimum timing for the best torque timing comprising using an ionization signal to calculate the minimum timing for the best torque timing, wherein said step of using an ionization signal to calculate the minimum timing for the best torque timing comprises combining one or more of a maximum flame acceleration point, a maximum heat release location and a second peak location.

View all claims
  • 12 Assignments
Timeline View
Assignment View
    ×
    ×