×

Utility meter with external signal-powered transceiver

  • US 7,126,493 B2
  • Filed: 09/13/2002
  • Issued: 10/24/2006
  • Est. Priority Date: 09/14/2001
  • Status: Expired due to Term
First Claim
Patent Images

1. An arrangement for use in a utility meter, comprising:

  • a non-volatile memory having a first and a second port, the first port configured to obtain commodity consumption data;

    a radio frequency (RF) transceiver configured to receive an RF signal from an external source,obtain energy from the RF signal and provide the energy to a bias voltage input of the non-volatile memory,perform a data transfer operation responsive to the received RF signal, the data transfer operation including a transfer of meter-related data between the non-volatile memory and the RF transceiver using the second port of the non-volatile memory.

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×