×

System and method for continuous online safety and reliability monitoring

  • US 7,133,727 B2
  • Filed: 10/10/2003
  • Issued: 11/07/2006
  • Est. Priority Date: 08/01/2003
  • Status: Active Grant
First Claim
Patent Images

1. A method for managing a safety instrumented function including a plurality of instrumented function components, the method comprising:

  • obtaining a test completion time for at least one of the plurality of instrumented function components;

    determining a probability of failure on demand for the safety instrumented function based on the test completion time;

    comparing the probability of failure on demand with a designed probability of failure on demand for the safety instrumented function to establish a variance; and

    managing the plurality of instrumented function components based on the variance.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×