System and method for managing construction machinery
First Claim
1. A construction machine management system, for managing construction machines in such a way as to permit operations of construction machines only under specified working conditions while inhibiting operations of said construction machines when not in agreement with said specified working conditions, said system comprising:
- working condition setup means adapted to set up working conditions for each one of said construction machines, said working conditions including a working time zone in addition to a geographical working area;
a memory means for storing the working conditions set up by said working condition setup means;
a status checkup means adapted to check for current status of each one of said construction machines against both of said geographical working area and working time zone specified by said setup working conditions at predetermined time intervals including rest time periods;
an operation inhibiting means adapted to inhibit operation of a construction machines when in a state incongruent with said setup working conditions with regard to both of said working area and working time zone, while permitting operation of said construction machines when satisfying both of said working area and working time zone of said working conditions; and
a communication means adapted to report said management center current position and time of a construction machine as soon as operation of said construction machine is inhibited by said operation inhibiting means.
1 Assignment
0 Petitions
Accused Products
Abstract
Construction machine management, permitting operation of a construction machine only under specified conditions and inhibiting its operation in case it is in a state incongruent with preset working conditions. Working conditions for each construction machine are set up by a working conditions setup means, including a geographically divided working area and a working time zone in which a construction machine is allowed to operate in a specified working area. Setup working conditions are stored in a memory means. At the time of starting a construction machine, the status of the construction machine is checked for by a status checkup means which is adapted to check for current position of the construction machine and current time against the working area and working time zone of the setup working conditions. In case a construction machine is found to be in a state incongruent with both of the working area and the working time zone of the preset working conditions, the management inhibits operation of that construction machine.
-
Citations
9 Claims
-
1. A construction machine management system, for managing construction machines in such a way as to permit operations of construction machines only under specified working conditions while inhibiting operations of said construction machines when not in agreement with said specified working conditions, said system comprising:
-
working condition setup means adapted to set up working conditions for each one of said construction machines, said working conditions including a working time zone in addition to a geographical working area; a memory means for storing the working conditions set up by said working condition setup means; a status checkup means adapted to check for current status of each one of said construction machines against both of said geographical working area and working time zone specified by said setup working conditions at predetermined time intervals including rest time periods; an operation inhibiting means adapted to inhibit operation of a construction machines when in a state incongruent with said setup working conditions with regard to both of said working area and working time zone, while permitting operation of said construction machines when satisfying both of said working area and working time zone of said working conditions; and a communication means adapted to report said management center current position and time of a construction machine as soon as operation of said construction machine is inhibited by said operation inhibiting means. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A method of managing construction machines for permitting operations of construction machines only under specified working conditions while inhibiting operations of said construction machines when not in agreement with said specified working conditions, said method comprising the steps of:
-
setting up working conditions for each one of construction machines under surveillance, including a geographic working area and a working time zone for operation in said geographic working area; checking for current location of each one of said construction machines and current time against setup geographic working area and working time zone every time when said construction machine is started, and regularly at predetermined time intervals including rest periods of said construction machine, to check whether or not status of said construction machine is in agreement with said working conditions with regard to both of said geographic working area and working time zone; inhibiting operation of said construction machine when found incongruent with both of said working area and working time zone of setup working conditions, while permitting operation of said construction machine when satisfying both of said setup working conditions; and reporting a management center current position and current time of a construction machine as soon as operation of said construction machine is inhibited due to failure to satisfy both of said setup working conditions. - View Dependent Claims (9)
-
Specification