Method for optimizing a large-scale industrial facility, especially a power plant
First Claim
1. A method for optimizing a steam power station having at least one boiler assembly, at least one steam turbine assembly, at least one condenser assembly, at least one generator assembly and at least one flue gas cleaning device, the method comprising the steps of:
- comparing the characteristic variables of the at least one boiler assembly, of the at least one steam turbine assembly, of the at least one condenser assembly, of the at least one generator assembly and of the at least one flue gas cleaning device with predetermined reference values;
determining those assemblies of the at least one boiler assembly, of the at least one steam turbine assembly, of the at least one condenser assembly, of the at least one generator assembly and of the at least one flue gas cleaning device whose characteristic variables are poorer than their predetermined reference values; and
optimizing only those assemblies of the at least one boiler assembly, of the at least one steam turbine assembly, of the at least one condenser assembly, of the at least one generator assembly and of the at least one flue gas cleaning device whose characteristic variables are poorer than their predetermined reference values.
1 Assignment
0 Petitions
Accused Products
Abstract
The invention relates to a method for optimizing a large-scale industrial facility, especially a power plant, consisting of m subassemblies (BGj), wherein j=1(1)m) and wherein the following steps are successively carried out: comparing the parameters (KGj) of all subassemblies (BG1 to BGj) with predetermined reference values (RWj); detecting the subassemblies (Bgi) with i=1(1)m, whose parameters (KG1) are worse than the reference values (RWi) and optimizing the subassemblies (BG1) whose parameters (KGi) are worse than the reference values (RW1).
7 Citations
10 Claims
-
1. A method for optimizing a steam power station having at least one boiler assembly, at least one steam turbine assembly, at least one condenser assembly, at least one generator assembly and at least one flue gas cleaning device, the method comprising the steps of:
-
comparing the characteristic variables of the at least one boiler assembly, of the at least one steam turbine assembly, of the at least one condenser assembly, of the at least one generator assembly and of the at least one flue gas cleaning device with predetermined reference values; determining those assemblies of the at least one boiler assembly, of the at least one steam turbine assembly, of the at least one condenser assembly, of the at least one generator assembly and of the at least one flue gas cleaning device whose characteristic variables are poorer than their predetermined reference values; and optimizing only those assemblies of the at least one boiler assembly, of the at least one steam turbine assembly, of the at least one condenser assembly, of the at least one generator assembly and of the at least one flue gas cleaning device whose characteristic variables are poorer than their predetermined reference values. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. A storage medium encoded with machine readable computer program code for optimizing a steam power station having at least one boiler assembly, at least one steam turbine assembly, at least one condenser assembly, at least one generator assembly and at least one flue gas cleaning device assembly, the storage medium including instructions for causing a computer to implement a method comprising the steps of:
-
comparing the characteristic variables of the at least one boiler assembly, of the at least one steam turbine assembly, of the at least one condenser assembly, of the at least one generator assembly and of he at least one flue gas cleaning device assembly with predetermined reference values; determining those assemblies of the at least one boiler assembly, of the at least one steam turbine assembly, of the at least one condenser assembly, of the at least one generator assembly and of the at least one flue gas cleaning device assembly whose characteristic variables are poorer than their predetermined reference values; and optimizing only those assemblies of the at least one boiler assembly, of the at least one steam turbine assembly, of the at least one condenser assembly, of the at least one generator assembly and of the at least one flue gas cleaning device assembly whose characteristic variables are poorer than their predetermined reference values. - View Dependent Claims (10)
-
Specification