×

System and process for optimal selection of hydrocarbon well completion type and design

  • US 7,181,380 B2
  • Filed: 12/20/2002
  • Issued: 02/20/2007
  • Est. Priority Date: 12/20/2002
  • Status: Active Grant
First Claim
Patent Images

1. A process for selecting well completion design before drilling a proposed well comprising:

  • considering hydrocarbon recovery models relating to a proposed well;

    determining completion design for desired hydrocarbon recovery over the life of the proposed well; and

    storing the completion design in a computer readable medium;

    wherein considering the hydrocarbon recovery models comprises determining the effect of pore pressure depletion on well production over the life of the well.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×