×

Method and system for testing a partially formed hydrocarbon well for evaluation and well planning refinement

  • US 7,207,395 B2
  • Filed: 01/30/2004
  • Issued: 04/24/2007
  • Est. Priority Date: 01/30/2004
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for testing a partially formed well, comprising:

  • forming a first well bore intersecting a subterranean formation, the first well bore comprising a portion of a well and having a first configuration;

    testing a production characteristic of the subterranean formation through the first well bore in the first configuration;

    reconfiguring the first well bore to a second configuration disparate from the first configuration by cutting the subterranean formation to enlarge a transverse dimension of the first well bore;

    testing the production characteristic of the subterranean formation through the first well bore in the second configuration;

    planning further formation of the well based on testing of the subterranean formation through the first well bore in the first and second configurations; and

    determining at least one characteristic of a substantially horizontal well bore pattern of the well based on testing of the first well bore in the first and second configurations.

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×