×

Scheduling ahead for various processes

  • US 7,337,032 B1
  • Filed: 10/04/2004
  • Issued: 02/26/2008
  • Est. Priority Date: 10/04/2004
  • Status: Active Grant
First Claim
Patent Images

1. A method of scheduling ahead in a process flow for a manufacturing domain entity, comprising:

  • detecting an occurrence of a triggering event defined for a current process operation on the manufacturing domain entity; and

    scheduling a target process operation upon expiration of a timed offset from the detection of the triggering event responsive to the detection thereof, the timed offset being defined for the target process operation scheduling.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×