×

Method for enhancing production allocation in an integrated reservoir and surface flow system

  • US 7,379,853 B2
  • Filed: 04/19/2002
  • Issued: 05/27/2008
  • Est. Priority Date: 04/24/2001
  • Status: Active Grant
First Claim
Patent Images

1. A method for enhancing allocation of fluid flow rates among a plurality of wellbores coupled to surface facilities, comprising:

  • modeling fluid flow characteristics of the wellbores and at least one reservoir penetrated thereby;

    modeling fluid flow characteristics of the surface facilities;

    operating an optimizer to determine an enhanced value of an objective function, the objective function corresponding simultaneously to the modeled fluid flow characteristics of the wellbores and the surface facilities, the objective function relating to at least one production system performance parameter comprising maximum oil production rate; and

    allocating fluid flow rates among the plurality of wellbores as determined by operating the optimizer.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×