Switch status and RFID tag
First Claim
Patent Images
1. A method, comprising:
- performing an operation based on a response to a poll by a radio frequency identification (RFID) reader;
wherein the response indicates a state of an electrical switch coupled to an RFID tag; and
wherein said performing comprises performing the operation if the response was received by the RFID reader within a designated time, and not performing the operation if the response was not received by the RFID reader within the designated time.
1 Assignment
0 Petitions
Accused Products
Abstract
One or more switches may be coupled to a radio frequency identification (RFID) tag, so that the response of the RFID tag indicates the state of the switch(es). The RFID tag and the switch(es) may be coupled together in various ways so that the state of the switches affects the response of the RFID tag to an RFID reader.
56 Citations
4 Claims
-
1. A method, comprising:
-
performing an operation based on a response to a poll by a radio frequency identification (RFID) reader; wherein the response indicates a state of an electrical switch coupled to an RFID tag; and wherein said performing comprises performing the operation if the response was received by the RFID reader within a designated time, and not performing the operation if the response was not received by the RFID reader within the designated time. - View Dependent Claims (2)
-
-
3. An article comprising
a tangible machine-readable medium that provides instructions, which when executed by one or more processors, cause said one or more processors to perform operations comprising: -
performing an operation based on a response to a poll by a radio frequency identification (RFID) reader; wherein the response indicates a state of an electrical switch coupled to an RFID tag; and wherein said performing comprises performing the operation if the response was received by the RFID reader within a designated time, and not performing the operation if the response was not received by the RFID reader within the designated time. - View Dependent Claims (4)
-
Specification