×

Enhanced manual start/stop sequencing controls for a stream turbine powered chiller unit

  • US 7,421,853 B2
  • Filed: 12/17/2004
  • Issued: 09/09/2008
  • Est. Priority Date: 01/23/2004
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method of manually staffing a chiller system driven by a steam turbine, the method comprising:

  • manually entering, by an operator, a start command into a control panel of the chiller system to initiate a steam turbine staff sequence;

    executing the steam turbine start sequence, wherein executing the steam turbine staff sequence comprises;

    performing a steam turbine vibration sensor verification; and

    initiating a pre-lubrication of the steam turbine and a compressor of the chiller system;

    selecting a hotwell pump from a plurality of hotwell pumps for operation; and

    starting the selected hotwell pump upon completion of the pre-lubrication of the steam turbine and the compressor;

    prompting the operator to enter a slow roll command upon completion of the steam turbine staff sequence to initiate a steam turbine slow roll mode operation;

    executing the steam turbine slow roll mode operation in response to entry of the slow roll command by the operator;

    prompting the operator to enter an acceleration command upon completion of the steam turbine slow roll mode operation to initiate a steam turbine acceleration process; and

    executing the steam turbine acceleration process to accelerate the steam turbine to an operational speed in response to entry of the acceleration command by the operator.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×