×

Precisely timed execution of a measurement or control action and synchronization of several such actions

  • US 7,457,601 B2
  • Filed: 10/15/2004
  • Issued: 11/25/2008
  • Est. Priority Date: 10/21/2003
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method of executing a measurement or control action, comprising the steps of:

  • generating a temporally periodic synchronization signal by a receiver based on a timing reference signal;

    dividing the temporally periodic synchronization signal by a switching frequency generated by a timing generator into a plurality of switching intervals; and

    associating a switching command to each of the switching intervals to trigger an associated switching process of the measurement or control action.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×