Optimization of management of maintenance, repair and overhaul of equipment in a specified time window
First Claim
Patent Images
1. A method for managing maintenance, repair or overhaul of equipment, the method comprising:
- retrieving a desired configuration for the equipment from a configuration definition database;
retrieving an actual configuration for the equipment from the configuration definition database;
identifying a configuration gap for the equipment based on the actual configuration and the desired configuration;
identifying an upgrade requirement driven by the configuration gap;
identifying a planned maintenance requirement for the equipment;
receiving an identification of an unplanned maintenance requirement for the equipment;
determining availability of the equipment for performing a maintenance task, the maintenance task including the upgrade requirement, the planned maintenance requirement, and the unplanned maintenance requirement, the equipment requiring maintenance in a specified time window, determining the availability of the equipment including;
forecasting task completion on the equipment; and
updating a status of the task completion in real time;
performing resource planning for performing the maintenance task in the specified time window based on resource requirements, the availability of the equipment including the status of the task completion, and cost models,wherein the resource requirements comprise labor, materials, tools, facilities, end item location, and time span for the maintenance task; and
wherein the cost models comprise personnel cost, employment cost, raw material cost, cost of consumable items and facility costs;
constraining the resource planning by a set of rules imposed by a specific business in a selected industry and being unique to operations of the specific business, wherein the set of rules differs for the specific business from other sets of rules for other business in the selected industry;
optimizing with a software tool a deployment of resources for the maintenance task for the equipment;
creating allocation transactions to assign a first material and a second material to the maintenance task to be performed on the equipment in the specified time window, including;
determining whether an existing prior allocation includes a true item designation that indicates a hard allocation of the first material and the second material;
soft allocating the second material into a virtual kit in a data processing system;
soft allocating the first material into the virtual kit in the data processing system; and
removing the first material from the virtual kit when the existing prior allocation includes the true item designation, which indicates that the first material must remain with the existing prior allocation and should be removed from the virtual kit; and
hard allocating the second material into a physical kit that is staged for the maintenance task that cannot be disrupted when the existing prior allocation does not include the true item designation, which indicates that the second material may be freely allocated, and wherein hard allocating the second material prevents the second material from being removed from the virtual kit.
8 Assignments
0 Petitions
Accused Products
Abstract
A method for planning, scheduling and allocation of maintenance, repair and overhaul resources includes establishing the configuration definition database, establishing a maintenance task database based on the configuration, determining the resource requirements for the maintenance tasks, optimizing the deployment of resources for those maintenance tasks in a specified time window based on resource requirements, resource availability, current maintenance execution status of equipment and activity-based cost models, creating allocation transactions to assign the resources to the specific tasks and initiating the kitting of material.
-
Citations
8 Claims
-
1. A method for managing maintenance, repair or overhaul of equipment, the method comprising:
-
retrieving a desired configuration for the equipment from a configuration definition database; retrieving an actual configuration for the equipment from the configuration definition database; identifying a configuration gap for the equipment based on the actual configuration and the desired configuration; identifying an upgrade requirement driven by the configuration gap; identifying a planned maintenance requirement for the equipment; receiving an identification of an unplanned maintenance requirement for the equipment; determining availability of the equipment for performing a maintenance task, the maintenance task including the upgrade requirement, the planned maintenance requirement, and the unplanned maintenance requirement, the equipment requiring maintenance in a specified time window, determining the availability of the equipment including; forecasting task completion on the equipment; and updating a status of the task completion in real time; performing resource planning for performing the maintenance task in the specified time window based on resource requirements, the availability of the equipment including the status of the task completion, and cost models, wherein the resource requirements comprise labor, materials, tools, facilities, end item location, and time span for the maintenance task; and wherein the cost models comprise personnel cost, employment cost, raw material cost, cost of consumable items and facility costs; constraining the resource planning by a set of rules imposed by a specific business in a selected industry and being unique to operations of the specific business, wherein the set of rules differs for the specific business from other sets of rules for other business in the selected industry; optimizing with a software tool a deployment of resources for the maintenance task for the equipment; creating allocation transactions to assign a first material and a second material to the maintenance task to be performed on the equipment in the specified time window, including; determining whether an existing prior allocation includes a true item designation that indicates a hard allocation of the first material and the second material; soft allocating the second material into a virtual kit in a data processing system; soft allocating the first material into the virtual kit in the data processing system; and removing the first material from the virtual kit when the existing prior allocation includes the true item designation, which indicates that the first material must remain with the existing prior allocation and should be removed from the virtual kit; and hard allocating the second material into a physical kit that is staged for the maintenance task that cannot be disrupted when the existing prior allocation does not include the true item designation, which indicates that the second material may be freely allocated, and wherein hard allocating the second material prevents the second material from being removed from the virtual kit. - View Dependent Claims (2, 3, 4, 5)
-
-
6. A resource allocation method comprising:
-
retrieving a desired configuration for equipment from a configuration definition database; retrieving an actual configuration for the equipment from the configuration definition database identifying a configuration gap for the equipment based on the actual configuration and the desired configuration; identifying a degradation associated with the configuration gap; identifying a maintenance task for the equipment for addressing the degradation; identifying an unplanned maintenance task for the equipment for addressing the degradation; determining a first resource and a second resource for the maintenance task which are available during the maintenance time window; determining availability of the equipment for performing a maintenance task, the maintenance task including the upgrade requirement, the planned maintenance requirement, and the unplanned maintenance requirement, the equipment requiring maintenance in the maintenance time window, determining the availability of the equipment including; forecasting task completion on the equipment; and updating a status of the task completion in real time; obtaining an activity based cost model for the first and second resources wherein the cost models comprise personnel cost, employment cost, raw material cost, cost of consumable items and facility costs; performing resource planning for performing the maintenance task in the maintenance time window based on resource requirements, the availability of the equipment including the status of the task completion, and the activity based cost model; wherein the resource requirements comprise labor, materials, tools, facilities, end item location, and time span for the maintenance task; and constraining the resource planning by a set of rules imposed by a specific business in a selected industry and being unique to operations of the specific business, wherein the set of rules differs for the specific business from other sets of rules for other businesses in the selected industry; optimizing, with a software tool in a data processing system, deployment of the first and second resources; determining whether an existing prior allocation includes a true item designation that indicates a hard allocation of the first resource and the second resource; creating a first soft allocation transaction to assign the second resource to the maintenance task for the equipment item; creating a virtual kit in a data processing system in response to creating the first soft allocation; creating a second soft allocation transaction to assign the first resource into the virtual kit in the data processing system; removing the first resource from the virtual kit when the existing prior allocation includes the true item designation, which indicates that the first resource must remain with the existing prior allocation and should be removed from the virtual kit; and creating a hard allocation transaction to assign the second resource to the maintenance task that cannot be disrupted when the existing prior allocation does not include the true item designation, which indicates that the second resource may be freely allocated, and wherein hard allocating the second resource prevents the second resource from being removed from the virtual kit; and creating a physical kit comprising the second resource in response to creating the hard allocation. - View Dependent Claims (7, 8)
-
Specification