Predictive maintenance system
First Claim
Patent Images
1. A predictive maintenance method for an item of equipment, the method comprising:
- establishing a first business module as a first resultant business framework for supporting maintenance work on the item of equipment, the resultant business framework comprising at least three feature modules including;
a prediction module determining predictive maintenance as part of the maintenance work based on an actual discovery of a maintenance need from inspection of the equipment, estimation of the maintenance need from a current performance evaluation of the equipment, and a forecast of the maintenance need from historical performance evaluation of the equipment,a resource availability module comprising temporal data and related geographic data of resources for performing prospective predictive maintenance activity; and
an integration module comprising a scheduler integrating the prediction module and the resource availability module;
selecting first core elements for the first business module required for performing the maintenance work on the item of equipment wherein the core elements comprise modular constituent parts of the first business module, and wherein desired features of the first business module determine the first core elements and define functions of the first core elements, the first core elements including;
a performance data manager in the prediction module managing storage and retrieval of performance standard data indicative of a measurable achievement of a required specific task of the maintenance work within a specified time limit; and
an availability data manager in the resource availability module managing storage and retrieval of availability data, the availability data including worker data, facility data, tool data and component data for performing the maintenance work;
organizing the first core elements into the first resultant business framework of a first provider of the maintenance work;
establishing an additional business module comprising additional core elements as an additional resultant business framework of an additional provider of the maintenance work;
integrating and linking the first core elements and the additional core elements across the first business module and the additional business module for allocation of human resources, test equipment, maintenance tools, components, infrastructure and a facility for performing the predictive maintenance included in the maintenance work; and
executing the established first business module by predicting with the prediction module, and as part of the maintenance work, a first required maintenance activity on a first component and a second required maintenance activity on a second component by;
prior to performing either of the first and second required maintenance activities, identifying the first component and the second component as suspect components of the item of equipment when first component performance data, received from an equipment sensor, and second component performance data, input at a prediction module user interface, deviate from a defined performance standard;
flagging the first component and the second component of the item of the equipment with a suspect status;
clearing the suspect status of the first component in response to an acknowledgement input at the prediction module user interface prior to initiating performance of the first required maintenance activity;
determining a preliminary maintenance schedule for performing the second required maintenance activity on the second equipment; and
wherein executing the established business module further comprises scheduling performance of the second required maintenance activity for the item of the equipment with the scheduler by;
determining a first revision to the preliminary maintenance schedule, the first revision specifying substitution of an alternate component for the second component of the item of equipment; and
generating a resultant maintenance schedule based on the preliminary maintenance schedule and the first revision.
3 Assignments
0 Petitions
Accused Products
Abstract
A method and system for maintaining an item of equipment supports the provision of predictive maintenance in a manner which eliminates or reduces downtime of the equipment. The method includes tracking performance data on the equipment or a particular component of the equipment. At least one required maintenance activity is predicted based upon the performance data with respect to a defined performance standard. Performance of the required maintenance activity is scheduled at a defined respective time based upon the prediction.
133 Citations
15 Claims
-
1. A predictive maintenance method for an item of equipment, the method comprising:
-
establishing a first business module as a first resultant business framework for supporting maintenance work on the item of equipment, the resultant business framework comprising at least three feature modules including; a prediction module determining predictive maintenance as part of the maintenance work based on an actual discovery of a maintenance need from inspection of the equipment, estimation of the maintenance need from a current performance evaluation of the equipment, and a forecast of the maintenance need from historical performance evaluation of the equipment, a resource availability module comprising temporal data and related geographic data of resources for performing prospective predictive maintenance activity; and an integration module comprising a scheduler integrating the prediction module and the resource availability module; selecting first core elements for the first business module required for performing the maintenance work on the item of equipment wherein the core elements comprise modular constituent parts of the first business module, and wherein desired features of the first business module determine the first core elements and define functions of the first core elements, the first core elements including; a performance data manager in the prediction module managing storage and retrieval of performance standard data indicative of a measurable achievement of a required specific task of the maintenance work within a specified time limit; and an availability data manager in the resource availability module managing storage and retrieval of availability data, the availability data including worker data, facility data, tool data and component data for performing the maintenance work; organizing the first core elements into the first resultant business framework of a first provider of the maintenance work; establishing an additional business module comprising additional core elements as an additional resultant business framework of an additional provider of the maintenance work; integrating and linking the first core elements and the additional core elements across the first business module and the additional business module for allocation of human resources, test equipment, maintenance tools, components, infrastructure and a facility for performing the predictive maintenance included in the maintenance work; and executing the established first business module by predicting with the prediction module, and as part of the maintenance work, a first required maintenance activity on a first component and a second required maintenance activity on a second component by; prior to performing either of the first and second required maintenance activities, identifying the first component and the second component as suspect components of the item of equipment when first component performance data, received from an equipment sensor, and second component performance data, input at a prediction module user interface, deviate from a defined performance standard; flagging the first component and the second component of the item of the equipment with a suspect status; clearing the suspect status of the first component in response to an acknowledgement input at the prediction module user interface prior to initiating performance of the first required maintenance activity; determining a preliminary maintenance schedule for performing the second required maintenance activity on the second equipment; and wherein executing the established business module further comprises scheduling performance of the second required maintenance activity for the item of the equipment with the scheduler by; determining a first revision to the preliminary maintenance schedule, the first revision specifying substitution of an alternate component for the second component of the item of equipment; and generating a resultant maintenance schedule based on the preliminary maintenance schedule and the first revision. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 14)
-
-
11. A computer architecture for implementing a predictive maintenance system for an item of equipment, comprising:
-
a first business module as a first resultant business framework for supporting maintenance work on the item of equipment, the resultant business framework comprising at least three feature modules including; a prediction module operable to determine predictive maintenance as part of the maintenance work based on an actual discovery of a maintenance need from inspection of the equipment, estimation of the maintenance need from a current performance evaluation of the equipment, and a forecast of the maintenance need from historical performance evaluation of the equipment; a resource availability module comprising temporal data and related geographic data of resources for performing prospective predictive maintenance activity; and an integration module comprising a scheduler that integrates the prediction module and the resource availability module; first core elements for the first business module required for performing the maintenance work on the item of equipment wherein the core elements comprise modular constituent parts of the first business module, and wherein desired features of the first business module determine the first core elements and define functions of the first core elements, the first core elements organized into the first resultant business framework of a first provider of the maintenance work, the first core elements including; a performance data manager in the prediction module and operable to manage storage and retrieval of performance standard data indicative of a measurable achievement of a required specific task of the maintenance work within a specified time limit; and an availability data manager in the resource availability module and operable to manage storage and retrieval of availability data, the availability data including worker data, facility data, tool data and component data for performing the maintenance work; an additional business module comprising additional core elements as an additional resultant business framework of an additional provider of the maintenance work; a data processing system operable to; integrate and link the first core elements and the additional core elements across the first business module and the additional business module for allocation of human resources, test equipment, maintenance tools, components, infrastructure and a facility for performing the predictive maintenance included in the maintenance work; and execute the first business module by executing the prediction module to predict a first required maintenance activity on a first component and a second required maintenance activity on a second component, wherein the prediction module is further operable to; identify, prior to performing either of the first and second required maintenance activities, the first component and the second component as suspect components of the item of equipment when the first component performance data, received from an equipment sensor, and the second component performance data, input at a prediction module user interface, deviate from a defined performance standard; flag the first and second components with a suspect status, clear the suspect status of the first component in response to an acknowledgement input at the prediction module user interface prior to initiating performance of the first required maintenance activity for the first component, and determine a preliminary maintenance schedule for performing the second required maintenance activity on the second component; and wherein the data processing system is further operable to execute the first business module by executing the scheduler, the scheduler operable to; accept input from the prediction module and schedule the second required maintenance activity for the second component of the item of equipment in a resultant maintenance schedule; determine a first revision to the preliminary maintenance schedule, the first revision specifying substitution of an alternate component for the second component of the item of equipment; and
,generate the resultant maintenance schedule based on the preliminary maintenance schedule and the first revision. - View Dependent Claims (12, 13, 15)
-