×

Methods and systems for sampling heavy oil reservoirs

  • US 7,464,755 B2
  • Filed: 12/12/2006
  • Issued: 12/16/2008
  • Est. Priority Date: 12/12/2006
  • Status: Active Grant
First Claim
Patent Images

1. A method comprising:

  • (a) circulating a heated fluid in a first region of a reservoir where a heavy oil composition is present or believed present using a surface pump and a well completion comprising a downhole pump for a time and flow rate sufficient to produce flowable heavy oil composition, the well completion comprising a sampling tool; and

    (b) sampling the flowable heavy oil composition using the sampling tool.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×