Method and a system for testing of a power management system of a marine vessel
First Claim
1. A system for testing a power management system (2) of a marinevessel (1), in which said power management system (2) is arranged for controlling systems (6) that produce electrical energy, in which said power management system (2) is arranged for receiving first signals (9) from a power consuming system (7), in which said power management system (2) as a response to said first signals (9) is arranged for furnishing second control signals (10) to a power generation system (6) arranged for furnishing power (P) to said power consuming system (7),characterized bya simulator (120) arranged for being connected to said power management system (2), said simulator (120) includinga simulated power consuming system (7′
- ) arranged for receiving real and/or simulated control signals (8, 8′
) pertaining to a desired state of said simulated power consuming system (7′
),a simulated power generation module (6′
) arranged for furnishing simulated power (P′
) to said simulated power consuming system (7′
),said simulated power consuming system (7′
) arranged for furnishing simulated signals (9′
) to said power management system (2),said power management system (2) arranged for furnishing control signals (10) to said simulated power generation system (6′
) as a response to said simulated signals (9′
),said simulated power generation system (6′
) arranged for providing simulated power (P′
) to said simulated power consuming system (7′
) as a response to said control signals (10),for the functional, performance or failure mode testing of said power management system (2).
1 Assignment
0 Petitions
Accused Products
Abstract
Herein disclosed is a system for testing a power management system (2) of a marine vessel (1), in which said power management system (2) is arranged for controlling systems (6) that produce electrical energy, in which said power management system (2) is arranged for receiving first signals (9) from a power consuming system (7). As a response to said first signals (9) said power management system (2) is arranged for furnishing second control signals (10) to a power generation system (6) arranged for furnishing power (P) to said power consuming system (7) and/or to one or more electrical power distribution grid (90),
- characterized by
- a simulator (120) arranged for being connected to said power management system (2), said simulator (120) including
- a simulated power consuming system (7′) arranged for receiving real and/or simulated control signals (8, 8′) pertaining to a desired state of said simulated power consuming system (7′),
- a simulated power generation module (6′) arranged for furnishing simulated power (P′) to said simulated power consuming system (7′),
- said simulated power consuming system (7′) arranged for furnishing simulated signals (9′) to said real power management system (2),
- said real power management system (2) arranged for furnishing control signals (10) to said simulated power generation system (6′) as a response to said simulated signals (9′),
- said simulated power generation system (6′) arranged for providing simulated power (P′) to said simulated power consuming system (7′) as a response to said control signals (10),
- for the functional testing and/or failure mode testing of said power management system (2) under said simulated signals (9′).
-
Citations
55 Claims
-
1. A system for testing a power management system (2) of a marine
vessel (1), in which said power management system (2) is arranged for controlling systems (6) that produce electrical energy, in which said power management system (2) is arranged for receiving first signals (9) from a power consuming system (7), in which said power management system (2) as a response to said first signals (9) is arranged for furnishing second control signals (10) to a power generation system (6) arranged for furnishing power (P) to said power consuming system (7), characterized by a simulator (120) arranged for being connected to said power management system (2), said simulator (120) including a simulated power consuming system (7′ - ) arranged for receiving real and/or simulated control signals (8, 8′
) pertaining to a desired state of said simulated power consuming system (7′
),a simulated power generation module (6′
) arranged for furnishing simulated power (P′
) to said simulated power consuming system (7′
),said simulated power consuming system (7′
) arranged for furnishing simulated signals (9′
) to said power management system (2),said power management system (2) arranged for furnishing control signals (10) to said simulated power generation system (6′
) as a response to said simulated signals (9′
),said simulated power generation system (6′
) arranged for providing simulated power (P′
) to said simulated power consuming system (7′
) as a response to said control signals (10),for the functional, performance or failure mode testing of said power management system (2). - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29)
- ) arranged for receiving real and/or simulated control signals (8, 8′
-
30. A method for testing the power management system (2) of a marine
vessel (1), in which said power management system (2) controls electrical energy generation systems (6), in which said power management system (2) receives first signals (9) from a power consuming system (7), and as a response to which said power management system (2) furnishes second control signals (10) to a power generation system (6) furnishing power (P) to said power consuming system (7), characterized by connecting a simulator (120) to said power management system (2), said simulator (120) providing simulated control signals (8′ - ) pertaining to a desired state of a simulated power consuming system (7′
) to said simulated power consuming system (7′
) or an external system (3) providing real control signals (8) pertaining to said desired state of said simulated power consuming system (7′
),said simulator (120) comprising a simulated power generation module (6′
) furnishing simulated power (P′
) to said simulated power consuming system (7′
),said simulated power consuming system (7′
) providing simulated signals (9′
) to said power management system (2),said power management system (2) furnishing control signals (10) to said simulated power generation system (6′
) as a response to said simulated signals (9′
),said simulated power generation system (6′
) providing simulated power (P′
) to said simulated power consuming system (7′
) as a response to said control signals (10),for the functional, performance or failure mode testing of said power management system (2). - View Dependent Claims (31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55)
- ) pertaining to a desired state of a simulated power consuming system (7′
Specification