×

System and method for effectuating the creation and management of customer pick-up/backhaul programs between buyers and sellers in a supply community

  • US 7,467,091 B2
  • Filed: 03/22/2004
  • Issued: 12/16/2008
  • Est. Priority Date: 03/22/2004
  • Status: Expired due to Fees
First Claim
Patent Images

1. A computer program product comprising a computer readable medium having computer readable program code embodied thereon and configured to control a computer to perform the method of:

  • a seller creating a customer pick-up program by selecting at least one customer pick-up program strategy option, selecting at least one customer pick-up program allowance unit rate structure option, and selecting decision rules by which a customer pick-up program allowance unit rate structure option is selected to determine a customer pick-up program allowance for a single shipment, wherein the step of seller creating a customer pick-up program comprises entering attribute data including customer pick-up program strategy, policy, procedures, and shipping location profilesthe seller providing information for at least one seller shipping location;

    a buyer selecting one of the at least one customer pick-up program strategy options selected by the seller and submitting a customer pick-up program proposal and request to the seller, wherein the customer pick-up program proposal and request is determined based on the selected program strategy option;

    the buyer and seller selecting a determined customer pick-up allowance unit rate and at least one customer pick-up program allowance unit rate structure option for each customer pick-up program allowance; and

    determining the customer pick-up program allowance for a specific shipment using the selected customer pick-up allowance unit rate structure option,wherein the customer pick-up (CPU) allowance for the specific shipment is determined by the formulae;

    CPU



    Allowance



    Unit



    Rate



    ( $ / UOM )
    = ( Gainshare



    Allocation



    Factor
    )
    ×

    { ( Scaling



    Factor
    )
    ×

    [ ( Line



    Haul



    Cost
    )
    + ( Fuel



    Adjustment



    Term
    )
    ]
    + Accessorials
    }
    ( Standard



    No .

    of




    Units
    )
    CPU



    Allowance



    ( $ )
    = ( Performance



    Factor
    )
    ×



    [ ( CPU



    Allowance



    Unit



    Rate
    )
    ×

    ( No .

    of




    Units



    on



    Shipment
    )
    ]


    .

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×