Large inventory-service optimization in configure-to-order systems
First Claim
1. A method of managing manufacturing logistics of end products to enable customers to configure orders from components, comprising:
- maintaining an inventory of components, which components, termed “
building blocks”
, are built to stock, each said component having a cost, a base-stock level having been established for each of said components, the cost of at least one of said components of an end product being higher than the cost of at least one other component of said end product;
selecting by a customer of components for said end product, said end product being assembled for the customer from said inventory of said selected components;
replenishing said respective selected components in accordance with said respective base-stock levels so as to reduce a total cost of inventory of said selected components by weighting a reduction in inventory toward said at least one higher priced component, there being a network of inventory queues whose configuration is determined by a bill of materials structure of said end product,wherein said base-stock level R for the ith said component in a period t is defined as
Ri(t);
=μ
i(t)+ki(t)σ
i(t),where ki(t) is a desired safety factor, while μ
i(t) and σ
i(t) can be derived (via queuing analysis) as
μ
i(t)=Σ
s=tt+liin−
1Ε
[Di(s)], and
σ
i2(t)=Σ
s=tt+liin31 1Var[Di(s)], respectively,where liin;
=Ε
[Liin] is expected in-bound leadtime; and
wherein Ri(t) is translated into “
days of supply”
(DOS), where the μ
i(t) part of Ri(t) translates into periods of demand and the ki(t)σ
i(t) part of Ri(t) is turned into
k(t)o1()periods of demand so that Ri(t) is expressed in terms of periods of DOS as
DOSi(t)=liin[1+ki(t)σ
i(t)/μ
i(t)].
0 Assignments
0 Petitions
Accused Products
Abstract
A manufacturing process is migrated from an existing operation to a configure-to-order (CTO) system. As the CTO operation will eliminate the “machine-type model” (MTM) inventory of the existing operation, the emphasis is shifted to the components, or “building blocks”, which will still follow the build-to-stock scheme, due to their long leadtimes, and hence still require inventory. The solution involves an inventory-service trade-off of the new CTO system, resulting in performance gains, in terms of reduced inventory cost and increased service level. Other benefits of the method include better forecast accuracy through parts commonality and risk-pooling, and increased customer demand, as orders will no longer be confined within a restricted set of pre-configured MTMs.
31 Citations
1 Claim
-
1. A method of managing manufacturing logistics of end products to enable customers to configure orders from components, comprising:
-
maintaining an inventory of components, which components, termed “
building blocks”
, are built to stock, each said component having a cost, a base-stock level having been established for each of said components, the cost of at least one of said components of an end product being higher than the cost of at least one other component of said end product;selecting by a customer of components for said end product, said end product being assembled for the customer from said inventory of said selected components; replenishing said respective selected components in accordance with said respective base-stock levels so as to reduce a total cost of inventory of said selected components by weighting a reduction in inventory toward said at least one higher priced component, there being a network of inventory queues whose configuration is determined by a bill of materials structure of said end product, wherein said base-stock level R for the ith said component in a period t is defined as
Ri(t);
=μ
i(t)+ki(t)σ
i(t),where ki(t) is a desired safety factor, while μ
i(t) and σ
i(t) can be derived (via queuing analysis) as
μ
i(t)=Σ
s=tt+li in −
1Ε
[Di(s)], and
σ
i2(t)=Σ
s=tt+li in 31 1Var[Di(s)], respectively,where liin;
=Ε
[Liin] is expected in-bound leadtime; andwherein Ri(t) is translated into “
days of supply”
(DOS), where the μ
i(t) part of Ri(t) translates into periods of demand and the ki(t)σ
i(t) part of Ri(t) is turned into
k(t)o1()periods of demand so that Ri(t) is expressed in terms of periods of DOS as
DOSi(t)=liin[1+ki(t)σ
i(t)/μ
i(t)].
-
Specification