×

Method and apparatus for managing a network component change

  • US 7,496,644 B2
  • Filed: 11/05/2004
  • Issued: 02/24/2009
  • Est. Priority Date: 11/05/2004
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method of managing a network component change in a data communications network having as components nodes and links defining a pre-change topology, comprising the steps, performed at a transitioning node, of:

  • forwarding all data assigned to the pre-change topology via the pre-change topology;

    defining a post-change topology;

    assigning all data assigned to the pre-change topology to the post-change topology;

    transitioning from the pre-change to the post-change topology;

    forwarding the data assigned to the post-change topology via the post-change topology;

    assigning the pre-change topology to a first topology space and the post-change topology to a second topology space;

    after transition to the post-change topology, rendering the first topology space congruent with the second topology space; and

    transitioning from the post-change topology in the second topology space to the first topology space.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×