Method, system and apparatus for generating decision trees integrated with petro-technical workflows
First Claim
1. A computerized method of generating a decision tree for a seismic to simulation workflow, comprising:
- identifying a plurality of elements of the seismic to simulation workflow;
receiving a plurality of modeling scenarios for each of the plurality of elements, wherein plurality of modeling-scenarios are associated with a plurality of realizations of the seismic to simulation workflow;
receiving a plurality of probabilities for the plurality of modeling scenarios;
generating a decision tree comprising a plurality of nodes and a plurality of branches in response to said plurality of modeling scenarios, wherein each level of the decision tree is associated with one of the plurality of elements, wherein the plurality of nodes are associated with the plurality of modeling scenarios, and wherein the plurality of branches arc based on the plurality of probabilities;
selecting, from the decision tree, a realization of the plurality of realizations; and
running the seismic to simulation workflow based on the realization to eliminate low profitability options of a reservoir.
3 Assignments
0 Petitions
Accused Products
Abstract
A method of generating a decision tree for a seismic to simulation workflow, including: identifying a plurality of elements of the seismic to simulation workflow; receiving a plurality of modeling scenarios for each of the plurality of elements, where each of the plurality of modeling scenarios is associated with a realization of the seismic to simulation workflow; receiving a plurality of probabilities for the plurality of modeling scenarios; and generating a decision tree comprising a plurality of nodes and a plurality of branches in response to said plurality of modeling scenarios, where each level of the decision tree is associated with one of the plurality of elements, where the plurality of nodes are associated with the plurality of modeling scenarios, and where the plurality of branches are based on the plurality of probabilities.
-
Citations
20 Claims
-
1. A computerized method of generating a decision tree for a seismic to simulation workflow, comprising:
-
identifying a plurality of elements of the seismic to simulation workflow;
receiving a plurality of modeling scenarios for each of the plurality of elements, wherein plurality of modeling-scenarios are associated with a plurality of realizations of the seismic to simulation workflow;receiving a plurality of probabilities for the plurality of modeling scenarios; generating a decision tree comprising a plurality of nodes and a plurality of branches in response to said plurality of modeling scenarios, wherein each level of the decision tree is associated with one of the plurality of elements, wherein the plurality of nodes are associated with the plurality of modeling scenarios, and wherein the plurality of branches arc based on the plurality of probabilities; selecting, from the decision tree, a realization of the plurality of realizations; and running the seismic to simulation workflow based on the realization to eliminate low profitability options of a reservoir. - View Dependent Claims (2, 3, 4, 17)
-
-
5. A program storage device readable by a machine tangibly embodying a program of instructions executable by the machine to perform method steps for generating a decision tree for a seismic to simulation workflow, said method steps comprising:
-
identifying a plurality of elements of the seismic to simulation workflow; receiving a plurality of modeling scenarios for each of the plurality of elements, wherein the plurality of modeling scenarios are associated with a plurality of realizations of the seismic to simulation workflow; receiving a plurality of probabilities for the plurality of modeling scenarios; generating a decision tree comprising a plurality of nodes and a plurality of branches in response to said plurality of modeling scenarios, wherein each level of the decision tree is associated with one of the plurality of elements, wherein the plurality of nodes are associated with the plurality of modeling scenarios, and wherein the plurality of branches are based on the plurality of probabilities; selecting, from the decision tree, a realization of the plurality of realizations; and
running the seismic to simulation workflow based on the realization to eliminate low profitability options of a reservoir. - View Dependent Claims (6, 7, 8, 18)
-
-
9. A system for generating a decision tree for a seismic to simulation workflow, comprising:
-
first apparatus for identifying a plurality of elements of the seismic to simulation workflow, for receiving a plurality of modeling scenarios for each of the plurality of elements, wherein the plurality of modeling scenarios are associated with a plurality of realizations of the seismic to simulation workflow, and for receiving a plurality of probabilities for the plurality of modeling scenarios; and second apparatus for generating a decision tree comprising a plurality of nodes and a plurality of branches in response to said plurality of modeling scenarios, wherein each level of the decision tree is associated with one of the plurality of elements, wherein the plurality of nodes are associated with the plurality of modeling scenarios, and wherein the plurality of branches are based on the plurality of probabilities; third apparatus for selecting from the decision tree, a realization of the plurality of realizations; and fourth apparatus for running the seismic to simulation workflow based on the realization to eliminate low profitability options of a reservoir. - View Dependent Claims (10, 11, 12, 19)
-
-
13. A computer program to be executed by a processor, said computer program, when executed by said processor, conducting a process for generating a decision tree, said process comprising:
-
identifying a plurality of elements of the seismic to simulation workflow; receiving a plurality of modeling scenarios for each of the plurality of elements, wherein the plurality of modeling scenarios are associated with a plurality of realizations of the seismic to simulation workflow; realizations of the seismic to simulation workflow; receiving a plurality of probabilities for the plurality of modeling scenarios; generating a decision tree comprising a plurality of nodes and a plurality of branches in response to said plurality of modeling scenarios, wherein each level of the decision tree is associated with one of the plurality of elements, wherein the plurality of nodes are associated with the plurality of modeling scenarios, and wherein the plurality of branches are based on the plurality of probabilities; selecting from the decision tree, a realization of the plurality of realizations; and running the seismic to simulation workflow based on the realization to eliminate low profitability options of a reservoir. - View Dependent Claims (14, 15, 16, 20)
-
Specification