Meter with IrDA port
First Claim
1. A meter including a first processor for processing at least one measurement, the meter comprising:
- an IrDA port for at least wirelessly transmitting data to an optical port of a computing device located at a predetermined distance away from the IrDA port, wherein the IrDA port comprises a second processor in operative communication with the first processor configured for receiving data from the first processor and converting the data to at least one IrDA protocol.
1 Assignment
0 Petitions
Accused Products
Abstract
A meter is provided of the type used for recording data primarily related to power and/or energy use. The meter includes an IrDA port for wirelessly transmitting and receiving data to and from the meter. Preferably, the IrDA port operates according to one or more of the standard IrDA protocols and is preferably mounted on the face of the meter to allow data to be read using a handheld computing device. Upon the detection of the handheld computing device, the IrDA port automatically transmits data to the handheld computing device. The handheld computing device is preferably programmed with application software for processing the read data. The processed data can then be transmitted either wirelessly or non-wirelessly to a computing device, such as a remote server or personal computer, for preparing bills, statistical charts, energy reports, etc.
25 Citations
26 Claims
-
1. A meter including a first processor for processing at least one measurement, the meter comprising:
an IrDA port for at least wirelessly transmitting data to an optical port of a computing device located at a predetermined distance away from the IrDA port, wherein the IrDA port comprises a second processor in operative communication with the first processor configured for receiving data from the first processor and converting the data to at least one IrDA protocol. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10)
-
11. A power meter for measuring power consumed including a first processor for processing the measured power, the power meter comprising:
an IrDA port for wirelessly transmitting data to an optical port of a computing device located at a predetermined distance away from the IrDA port, wherein the IrDA port comprises a second processor inoperative communication with the first processor configured for receiving the measured power from the first processor and converting the measured power to at least one IrDA protocol. - View Dependent Claims (12, 13, 14, 15, 16, 17)
-
18. A meter including a first processor for processing at least one measurement, the meter comprising:
a first optical port for at least wirelessly transmitting data to a second optical port of a computing device located at a predetermined distance away from the first optical port, wherein the first optical port comprises a second processor in operative communication with the first processor configured for receiving data from the first processor and converting the data to at least one transmission protocol.
-
19. A utility billing system comprising:
-
at least one meter including a first processor for processing at least one measurement, the at least one meter including an IrDA port for at least wirelessly transmitting data to an optical port of a handheld device located at a predetermined distance away from the IrDA port, wherein the IrDA port comprises a second processor in operative communication with the first processor configured for receiving data from the first processor and converting the data to at least one IrDA protocol; the handheld device configured for receiving and storing the converted data from the at least one meter and transmitting the converted data to a computing device; and the computing device configured for receiving the stored data of the at least one meter from the handheld device and for preparing a utility bill for each of the at least one meter based on the received stored data. - View Dependent Claims (20, 21, 22, 23, 24, 25, 26)
-
Specification