×

Data acquisition and processing system for risk assessment

  • US 7,533,798 B2
  • Filed: 02/23/2006
  • Issued: 05/19/2009
  • Est. Priority Date: 02/23/2006
  • Status: Active Grant
First Claim
Patent Images

1. A risk management system comprising:

  • a risk assessment component that updates in real time risk estimations of one or more machines via operational data collected from sensors operatively connected to the one or more machines;

    a data input component associated with the risk assessment component for acceptance of the operational data; and

    a routine that accesses an operator risk assessment parameter associated with a machine operator upon receipt of an identification parameter associated with the machine operator, the operator risk assessment parameter based at least in part on the machine operator'"'"'s skill level and used by the risk assessment component to determine whether the current risk estimation is within a range of acceptable operator risk conditions associated with the machine operator.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×