Systems and methods for producing hydrocarbons from tar sands formations
First Claim
Patent Images
1. A system for treating a tar sands formation, comprising:
- a plurality of heaters located in the formation, wherein the heaters include at least partially horizontal heating sections at least partially in a hydrocarbon layer of the formation, the heating sections being at least partially arranged in a pattern in the hydrocarbon layer, and the heaters being configured to provide heat to the hydrocarbon layer, the provided heat creating a plurality of drainage paths for mobilized fluids, at least two of the drainage paths converging proximate at least one, at least partially horizontal production well that is located to collect and produce mobilized fluids from at least one of the converged drainage paths in the hydrocarbon layer, and wherein at least one horizontal heating section that is creating one of the drainage paths is at least partially vertically displaced from the at least partially horizontal production well and is at least partially above the at least partially horizontal production well.
1 Assignment
0 Petitions
Accused Products
Abstract
A system for treating a tar sands formation is disclosed. A plurality of heaters are located in the formation. The heaters include at least partially horizontal heating sections at least partially in a hydrocarbon layer of the formation. The heating sections are at least partially arranged in a pattern in the hydrocarbon layer. The heaters are configured to provide heat to the hydrocarbon layer. The provided heat creates a plurality of drainage paths for mobilized fluids. At least two of the drainage paths converge. A production well is located to collect and produce mobilized fluids from at least one of the converged drainage paths in the hydrocarbon layer.
1081 Citations
28 Claims
-
1. A system for treating a tar sands formation, comprising:
a plurality of heaters located in the formation, wherein the heaters include at least partially horizontal heating sections at least partially in a hydrocarbon layer of the formation, the heating sections being at least partially arranged in a pattern in the hydrocarbon layer, and the heaters being configured to provide heat to the hydrocarbon layer, the provided heat creating a plurality of drainage paths for mobilized fluids, at least two of the drainage paths converging proximate at least one, at least partially horizontal production well that is located to collect and produce mobilized fluids from at least one of the converged drainage paths in the hydrocarbon layer, and wherein at least one horizontal heating section that is creating one of the drainage paths is at least partially vertically displaced from the at least partially horizontal production well and is at least partially above the at least partially horizontal production well. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17)
-
18. A method for treating a tar sands formation, comprising:
-
providing heat to at least part of a hydrocarbon layer in the formation from a plurality of heaters located in the formation, wherein the heaters include at least partially horizontal heating sections at least partially in a hydrocarbon layer of the formation, the heating sections being at least partially arranged in a pattern in the hydrocarbon layer, and the heaters being configured to provide heat to the hydrocarbon layer; wherein the provided heat creates a plurality of drainage paths for mobilized fluids, at least two of the drainage paths converging proximate at least one, at least partially horizontal production well; allowing at least some of the mobilized fluids from the formation to flow to the at least partially horizontal production well along at least one of the converged drainage paths; creating at least one of the drainage paths with at least one horizontal heating section that is at least partially vertically displaced and at least partially above the at least partially horizontal production well; and producing at least some of the mobilized fluids through the at least partially horizontal production well. - View Dependent Claims (19, 20, 21, 22, 23, 24, 25, 26, 27, 28)
-
Specification