×

Automatic spotter with electronic control system for pile driving and continuous flight auger drilling leads

  • US 7,575,398 B2
  • Filed: 08/17/2006
  • Issued: 08/18/2009
  • Est. Priority Date: 08/17/2006
  • Status: Active Grant
First Claim
Patent Images

1. A method for using a crane having a main body and a boom supporting a pile lead, comprising the steps of:

  • providing a hydraulically operated mechanical spoiler arm attached between the crane body and the pile lead;

    providing at least two electronic position sensors associated with the spoiler arm, and an electronic control system in electrical communication with the at least two electronic position sensors;

    using the electronic control system and the at least two spotter arm electronic position sensors to obtain angular information based on measuring angular relationships between the pile lead and the spotter arm when the pile lead is swung to the left or right of a centerline of the crane;

    using the electronic control system and the angular information to automatically maintain a front face of the pile lead approximately perpendicular to the centerline, thereby limiting torque induced in the boom during crane usage;

    providing a boom box connected to the boom and in electrical communication with the electronic control system, the boom box having one or more electronic position sensors; and

    fitting the boom box with one or more rubber springs, and thereby enabling controlled pile lead deflection in either or both of clockwise or counterclockwise directions while limiting load transmitted to the boom to a maximum allowable load.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×