1. A loadcenter for a first power source having a first status, a second power source having a second status, a third power source having a third status, a critical load and a non-critical load, said loadcenter comprising:
- a first distribution panel having a first circuit breaker to selectively receive power from the first power source;
a second distribution panel having a second circuit breaker to selectively receive power from the second power source;
a third circuit breaker to selectively supply power from the third power source to the first distribution panel;
a fourth circuit breaker to selectively supply power from the first distribution panel to the non-critical load;
a fifth circuit breaker to selectively supply power from the second distribution panel to the critical load;
a circuit isolator to selectively supply power from the first distribution panel to the second distribution panel; and
a controller structured to monitor at least the second status and the third status, and in response to the third power source being unacceptable and the second power source being acceptable, being further structured to;
open the third circuit breaker;
open the circuit isolator;
close the first circuit breaker; and
close the second circuit breaker,wherein the controller, in response to the second power source being unacceptable and the third power source being unacceptable, is further structured to;
open the third circuit breaker;
open the second circuit breaker;
close the circuit isolator; and
close the first circuit breaker.
1 Assignment
0 Petitions
Accused Products
Abstract
A loadcenter for supplying power to a critical load is capable of isolating a distribution panel distributing power to the critical load from another distribution panel distributing power to a non-critical load to enable the isolated distribution panels being supplied with power from separate generator power sources in response to power supplied by a utility power source to both distribution panels becoming unacceptable.
-
Citations
10 Claims
-
1. A loadcenter for a first power source having a first status, a second power source having a second status, a third power source having a third status, a critical load and a non-critical load, said loadcenter comprising:
-
a first distribution panel having a first circuit breaker to selectively receive power from the first power source; a second distribution panel having a second circuit breaker to selectively receive power from the second power source; a third circuit breaker to selectively supply power from the third power source to the first distribution panel; a fourth circuit breaker to selectively supply power from the first distribution panel to the non-critical load; a fifth circuit breaker to selectively supply power from the second distribution panel to the critical load; a circuit isolator to selectively supply power from the first distribution panel to the second distribution panel; and a controller structured to monitor at least the second status and the third status, and in response to the third power source being unacceptable and the second power source being acceptable, being further structured to; open the third circuit breaker; open the circuit isolator; close the first circuit breaker; and close the second circuit breaker, wherein the controller, in response to the second power source being unacceptable and the third power source being unacceptable, is further structured to; open the third circuit breaker; open the second circuit breaker; close the circuit isolator; and close the first circuit breaker. - View Dependent Claims (2, 3, 4, 5)
-
-
6. A method of supplying power to a critical load from a loadcenter including a first distribution panel having a first circuit breaker to selectively supply power from a first power source to the first distribution panel, a second distribution panel distribution power, to the critical load and having a second circuit breaker to selectively supply power from a second power source to the second distribution panel, a third circuit breaker selectively supplying power from a third power source to the first distribution panel, and a circuit isolator selectively providing power from the first distribution panel to the second distribution panel, said method comprising:
-
monitoring a status of the second power source; monitoring a status of the third power source; and in response to the third power source being unacceptable and the second power source being acceptable; opening the third circuit breaker; opening the circuit isolator; closing the first circuit breaker; and closing the second circuit breaker, said method further comprising in response to the third power source being unacceptable and the second power source being unacceptable; opening the third circuit breaker; opening the second circuit breaker; closing the first circuit breaker; and closing the circuit isolator. - View Dependent Claims (7, 8, 9, 10)
-
Specification