Monitoring system for concrete pilings and method of installation
First Claim
1. A method of forming a piling with wireless monitoring capabilities, comprisingplacing strands in a piling form;
- inserting a sensor package between the strands to position sensors of the sensor package in a piling core area;
placing an antenna so that the antenna is embedded flush with one side of the piling near a top of the piling;
placing at least one radio transmitter associated with the antenna so that it will be positioned within the piling;
securing the sensor package in position using a spring loaded support assembly that is generally vertically inserted into the piling form and resiliently engages at least two opposing ones of the strands via an outwardly directed spring forceconnecting the sensor package to the antenna via the radio using wires or cable; and
casting concrete in the piling form to embed the sensor package and the antenna.
2 Assignments
0 Petitions
Accused Products
Abstract
A system for tracking and monitoring data related to the manufacture, installation and/or life cycle of concrete structures, such as pilings, as well as related system components and methods for tracking, storing and accessing such data is provided. The system utilizes one or more embeddable antenna assemblies as well as sensor packages that are installed in the concrete structure form before casting. The antenna(s) provide wireless communication of the data from the structure. On board memory is also provided to store structure related data with the structure. A system for tracking a pile during driving is also provided.
-
Citations
16 Claims
-
1. A method of forming a piling with wireless monitoring capabilities, comprising
placing strands in a piling form; -
inserting a sensor package between the strands to position sensors of the sensor package in a piling core area; placing an antenna so that the antenna is embedded flush with one side of the piling near a top of the piling; placing at least one radio transmitter associated with the antenna so that it will be positioned within the piling; securing the sensor package in position using a spring loaded support assembly that is generally vertically inserted into the piling form and resiliently engages at least two opposing ones of the strands via an outwardly directed spring force connecting the sensor package to the antenna via the radio using wires or cable; and casting concrete in the piling form to embed the sensor package and the antenna. - View Dependent Claims (2, 3, 4, 5, 6)
-
-
7. A method of monitoring pilings, comprising:
-
inserting a sensor package between strands or reinforcements in a piling form to position sensors in a core area of a piling; holding the sensor package in place generally centered in a core of the piling using a spring loaded support assembly that is generally vertically inserted into the piling form and engages at least two opposing strands with a spring force of the spring loaded support assembly; casting the piling; driving the piling and obtaining data from the sensor package during driving; and at least one of monitoring the data obtained from the sensor package during driving and monitoring and using the data during the driving to adjust driving parameters for the piling. - View Dependent Claims (8, 9, 10, 11, 12, 13, 14, 15, 16)
-
Specification